
ISS International S.p.A. is currently looking for a Workover Rig Engineering Coordinator (FMWR) to join an important Oil & Gas development project based in the Milan area, Italy.
The selected professional will support the planning, coordination, and supervision of fast-moving workover rig activities, ensuring safe and efficient execution of well intervention and rig-related operations in line with technical, operational, and reporting requirements.
The role includes rig planning support, mobilization / demobilization coordination, interface with field and logistics teams, monitoring of rig performance KPIs, and support to operations reporting and optimization.
Main Requirements
Bachelor’s degree in Mechanical, Marine Engineering or other relevant Engineering discipline
At least 8 years of experience in the relevant discipline after graduation
Proven experience in workover operations, well intervention support, or rig coordination activities within the Oil & Gas sector
Good understanding of workover equipment, rig moves, wellsite logistics, and rig-related operations
Experience in performance monitoring, operations reporting, and coordination with contractors and service companies
Familiarity with HSE procedures, permit-to-work systems, and field operational controls
Strong coordination and reporting skills
Good command of English
Job Details
Location: Milan area, Italy
Start date: April 2026
Duration: 1 year, renewable
Working schedule: 8 hours/day – 5 days/week
Work mode: full time, on site
Accommodation and logistics: not provided
If you have solid experience in workover rig coordination or well intervention support within Oil & Gas projects and you are available to work full time on site in the Milan area, feel free to apply or get in touch.
#Workover #RigOperations #WellIntervention #OilAndGas #EngineeringCoordinator #EngineeringJobs

Excellence in Everything WE Do
ISS International SpA was born in 2004 as a limited liability company, with less than 10 employees; at that time we were operating from a single point based in Rome, Italy.
Today the Company has more than 400 employees from 20 different nationalities. We can develop and operate our business with branch offices that are located in the most strategic geographical area in the Energy worldwide scenario like Milan, Abu Dhabi, Doha, Alger, Aksai, Vibo Valentia, Benin City, Pointe Noire, Mexico Cuty and lately Baku.
In 2011, we had successfully managed the transition from a limited liability company to a joint stock company and the ISS International Spa yearly turnover is now about 30 million USD.
Thanks to the territorial expansion that has led the company to have 10 different branch offices, the yearly turnover forecasts are the achievement of 40 million USD in the next 3 years. The Company has never stopped investing in the R&D and today we can offer a wider and more specialized engineering support to the Energy sector lately PIXIS: a Digital Twin Platform.
ReEnergy, a company fully Committed
In developing activities for the Carbon foot Print reduction and tha ISS International Academy complete our Group of companies today.
Dynamism, Flexibility and Professionalism: these are ISS International structural features which, thanks to process deep knowledge, enable our engineers to offer support services tailored to our customers’ requirement, covering both technical and management areas:
• PMCs - Project Management Consulting Service
• EPIC - Engineering Procurement Installation Commissioning
• Training & Know-How Transfer
• Process & Production Engineering
• Commissioning & Start-Up
• Technical Assistance “On-Site”
• Maintenance Engineering
• QHSE Services
ISS International services range from specific consultancy and technical assistance services to the implementation of fully integrated projects.