Be part of the nation’s only repository for the disposal of nuclear waste known as Transuranic (TRU) waste.
Salado Isolation Mining Contractors, LLC (SIMCO), managing and operating contractor of the Waste Isolation Pilot Plant (WIPP) is currently seeking a qualified individual to serve as a Work Control Planner and join our team located in Carlsbad, New Mexico.
The successful candidate will be responsible for the development of corrective maintenance work control documents (WCDs) in support of Operations at the WIPP. Candidate will be responsible for obtaining and maintaining appropriate training and qualifications (e.g., Work Planner authorization card, 40-hour MSHA miner, RadWorker-II).
Job duties include:
These requirements must be met to be considered for this posting. Uploaded resumes and completed applications are the means of determination. Applicants are encouraged to provide a cover letter that addresses each of the minimum requirements and as many of the desired skills as applicable to their expertise.
$82,382 to $145,184 per year. Exempt grade level(s) 30-32. The specific salary offered to a candidate will be influenced by a variety of factors, particularly the candidate’s relevant experience and education.
*These benefits vary by position.
Equal employment opportunity, including veterans and individuals with disabilities.
If you are an applicant with a disability who requires a reasonable accommodation to complete any part of the application process or are limited in the ability—or unable to use—the online application system and need an alternative method for applying, you may contact (575) 234-8490 or email wipprecruiting@wipp.doe.gov for assistance. Upon receipt of this information, we will respond to you promptly to obtain more information about your request.
Reviews, and tests for the absence of any illegal drug as defined in 10 CFR 707.4, will be conducted by SIMCO and a background investigation by the Federal government may be required to obtain an access authorization prior to employment, and subsequent reinvestigations may be required.
Posting Duration: This posting will be open for application submissions for a minimum of seven (7) calendar days, including the posting date. SIMCO reserves the right to extend the posting date at any time.

Salado Isolation Mining Contractors, LLC (SIMCO) is comprised of Bechtel National Inc. and includes Los Alamos Technical Associates (LATA) as a New Mexico-based small business teaming subcontractor.
We manage and operate the Waste Isolation Pilot Plant for the U.S. Department of Energy.
Our core values of safety, quality, cost effectiveness, and productivity guide our performance and vision to be the U.S. Department of Energy's premier nuclear waste cleanup contractor.