ArcelorMittal Calvert, 1AMNS Way, Calvert Al 36513
The Tundish Refractory Installer is responsible for the safe and efficient installation, maintenance, repair, and removal of refractory systems used in tundishes for continuous steel casting operations. This position plays a critical role in ensuring refractory integrity, steel cleanliness, operational reliability, and customer satisfaction. The ideal candidate will be safety-focused, mechanically inclined, and capable of working in a physically demanding industrial environment.
*Including, but not limited to, the following:
Successful candidates will demonstrate:

Vesuvius Steel Flow Control develops solutions to channel and control the flow of molten steel from ladle > tundish > mould: Robotic Casting, Nozzles, Plates, Stoppers, Protection Tubes, Tundish Mould Fluxes, as well as Slide Gate Systems to regulate and monitor the steel flow.
These products have been designed to resist extreme thermomechanical stress and corrosive environments.
Most of these products are consumed during the process of making steel and, consequently, demand is primarily linked to steel production volumes.
Continuing innovation allows us to offer enriched solutions that create additional value in our customers’ processes.