Nordex Group

Tooling Engineer

Nordex Group  •  Tennessee / Indiana (Onsite)  •  12 hours ago
Apply
AI can make mistakes so check important info. Chat history is never stored.

Job Description

Within the Installation Processes&Tools team of the Operations/Optimizations Department (PM-EPC), he/she will be in charge of:

Design and validate tools for installation of Nordex turbines considering requirements from engineering, PM, QHSE and Sourcing

Define and update the Installation tooling specifications in alignment with the needs from PM Ops and the requirements from WTG designers

Translate the lessons learned from Wind Farm’s into requirements for Engineering to improve the WT design

Your Tasks:
Definition and validation of Installation tools. Installation standards and tooling calculation reports evaluation.

Creation of Installation manuals for the tools

Solve incidents and improvements actions opened by PM Ops and Quality Departments related to Installation tools.

Travelling to Wind Farms or factories for new tools or turbine prototypes to validate/review Installation tools.

Your Profile

  1. Degree in Industrial Engineering or similar

2. 3-5 years relevant experience

Nordex Group

About Nordex Group

The development, manufacture, project management and servicing of wind turbines in the onshore segment has been the core competence and passion of the Nordex Group and its more than 10,900 employees worldwide for 40 years.

As one of the world's largest wind turbine manufacturers, the Nordex Group offers high-yield, cost-efficient wind turbines that enable long-term and economical power generation from wind energy in all geographical and climatic conditions. The focus is on turbines in the 3 to 7 MW class, and the Group’s comprehensive product portfolio offers individual solutions for both markets with limited space and regions with limited grid capacities. A global service network, of around 380 service points throughout 30 countries, delivers service quickly to keep our systems running smoothly. The Group covers the needs of all customer segments within the global wind market, from large energy suppliers to SMEs operating power plants. With more than 61 GW of installed capacity worldwide, Nordex Group systems deliver sustainable energy throughout more than 80 per cent of the world’s energy market (excluding China).

Nordex SE is listed on the TecDAX and MDAX of the Frankfurt Stock Exchange (ISIN: DE000A0D6554). The headoffice of the company, with the Management Board and central corporate functions, is located in Hamburg, while the legal entity is registered in Rostock. At production facilities in Germany, Spain, Brazil, the US, and India, the Nordex Group produces nacelles, rotor blades and concrete towers. The Group also maintains offices and branches in more than 30 countries.

Industry
Manufacturing & Production
Company Size
5,001-10,000 employees
Headquarters
Hamburg, DE
Year Founded
Unknown
Social Media