
The offshore wind industry is moving towards larger wind turbines, larger monopile diameters and installations in increasingly challenging water depths and soil conditions. These developments are pushing the limits of conventional pile installation methods and creating a growing need for alternative installation techniques.
Within Heerema’s Foundation Engineering team, you will work on the further development and validation of a nonlinear time-domain model for vibratory pile installation.
The model captures the interaction between the monopile, vibro-lifting tool and surrounding soil during installation. Your research will focus on assessing and improving its predictive capabilities using available field data from large-diameter monopile installations.
You will investigate how well the model reproduces actual penetration behaviour and load transfer, analyse which model parameters have the strongest influence on the results, and explore the limitations of predicting pile refusal.
During this graduation assignment, you will:
Your work will contribute to a better understanding of vibratory pile installation and its potential as an efficient installation method with a lower environmental impact.
We are looking for an enthusiastic MSc student with a strong interest in offshore engineering, foundation engineering and numerical modelling.
Ideally, you:
Are you interested in offshore wind, foundation engineering and the engineering challenges behind installing the next generation of large monopiles? Then we would like to hear from you.

Heerema Marine Contractors is a world-leading marine contractor in the international offshore energy industry.