Sonatech, Inc.

Systems/Project Engineer

Sonatech, Inc.  •  $150k - $220k/yr  •  Isla Vista, CA (Onsite)  •  14 hours ago
Apply
AI can make mistakes so check important info. Chat history is never stored.

Job Description

We are seeking a highly motivated Systems Engineer to join Sonatech LLC in Santa Barbara, California. This position is project technical lead that oversees all design activity on a given product design.

Sonatech LLC is a premier undersea acoustics engineering and manufacturing company. With a focus on supplying advanced SONAR solutions for the US Navy, our technical expertise, customized design capabilities and diverse manufacturing abilities have led to Sonatech products being deployed in virtually every class of underwater Navy system currently in operation.

Located in beautiful Santa Barbara, CA five minutes from the beach, we pride ourselves as having a culture of innovation as well as first-class customer service. Sonatech has a challenging and rewarding work environment where employees can develop their careers by taking on new responsibilities and providing innovative solutions.

Job Description

This position is an opportunity to shape new products from scratch and improve existing ones. The candidate will work closely with customers to develop system concepts, technical requirements, and product specifications. Following, the candidate oversees systems design throughout the development lifecycle.

Responsibilities

  • Architecture development, interface definition, system modelling, algorithm development, data analysis, and trade studies
  • Provide technical leadership throughout product development lifecycle
  • Progress reporting to management and customer representatives
  • Oversee systems integration and customer trial activities
  • Generation of technical requirements and specifications, requirement management, compliance traceability and verification

Requirements

  • Bachelor's degree in electrical engineering
  • Minimum 5 years in active electrical engineer design
  • Minimum 5 years working as a system engineer with direct product design and architecture experience
  • Experience guiding products through the full development lifecycle and field trials
  • Excellent cross-functional troubleshooting skills
  • Strong oral and written communications skills including presenting to customers and senior leadership
  • US Citizenship required and ability to obtain a DoD secret security clearance

Preferred Skills

  • Masters's Degree in Electrical Engineering
  • Experience with underwater acoustic positioning systems for tracking and navigation
  • Understanding of underwater acoustic principles
  • Understanding of electronic systems with embedded SW applications
  • Experience in developing computer-based performance models in MATLAB to support system concept/design definition.

Benefits

Benefits include medical, dental and vision, life insurance, paid vacation and sick time, 3% 401K contribution (no matching required), company events.

Sonatech is an equal opportunity employer as to all protected groups, including protected veterans and individuals with disabilities.

Salary Range: $150,000 - $220,000

Sonatech, Inc.

About Sonatech, Inc.

Industry
Unknown
Company Size
Unknown
Headquarters
Unknown
Year Founded
Unknown
Social Media