Be part of the nation’s only repository for the disposal of nuclear waste known as Transuranic (TRU) waste.
Salado Isolation Mining Contractors, LLC (SIMCO), managing and operating contractor of the Waste Isolation Pilot Plant (WIPP) is currently seeking a qualified individual to serve as a Systems Administrator and join our team located in Carlsbad, New Mexico.
The successful candidate will have basic knowledge of server administration, SANS, operating systems (OS), SCCM, security operations and concepts in MS Windows and VMware operating systems. They must be able to work independently, as well as perform in a group setting, and follow directions. They must be able to establish and maintain effective working relationships and collaboration with customers and peer IT administration staff. Good written and verbal communication skills are required and must be willing to support on-call and after hours support as needed.
These requirements must be met to be considered for this posting. Uploaded resumes and completed applications are the means of determination.
Must be at least 18 years of age; U.S. citizenship is required except in limited circumstances. See DOE Order 472.2 for additional information.
*These benefits vary by position.
Exempt grade level(s) 29-31. Salary range: $75,013 to $130,969 per year --the specific salary offered to a candidate will be influenced by a variety of factors, particularly the candidate’s relevant experience and education.
Equal employment opportunity, including veterans and individuals with disabilities.
If you are an applicant with a disability who requires a reasonable accommodation to complete any part of the application process or are limited in the ability—or unable to use—the online application system and need an alternative method for applying, you may contact (575) 234-8490 or email wipprecruiting@wipp.doe.gov for assistance. Upon receipt of this information, we will respond to you promptly to obtain more information about your request.
Reviews, and tests for the absence of any illegal drug as defined in 10 CFR 707.4, will be conducted by SIMCO and a background investigation by the Federal government may be required to obtain an access authorization prior to employment, and subsequent reinvestigations may be required.
Posting Duration: This posting will be open for application submissions for a minimum of seven (7) calendar days, including the posting date. SIMCO reserves the right to extend the posting date at any time.

Salado Isolation Mining Contractors, LLC (SIMCO) is comprised of Bechtel National Inc. and includes Los Alamos Technical Associates (LATA) as a New Mexico-based small business teaming subcontractor.
We manage and operate the Waste Isolation Pilot Plant for the U.S. Department of Energy.
Our core values of safety, quality, cost effectiveness, and productivity guide our performance and vision to be the U.S. Department of Energy's premier nuclear waste cleanup contractor.