
The International Rescue Committee (IRC) responds to the world's worst humanitarian crises, helping to restore health, safety, education, economic wellbeing, and power to people devastated by conflict and disaster. Founded in 1933 at the call of Albert Einstein, the IRC is one of the world's largest international humanitarian non-governmental organizations (INGO), at work in more than 40 countries and 29 U.S. cities helping people to survive, reclaim control of their future and strengthen their communities. A force for humanity, IRC employees deliver lasting impact by restoring safety, dignity and hope to millions. If you're a solutions-driven, passionate change-maker, come join us in positively impacting the lives of millions of people world-wide for a better future.
PLAYMATTERS 3.0
Terms of Reference
For South Sudan country Risk Mapping, Analysis and Development of the Crisis Modifier Risk Matrix
Assignment : South Sudan country-level consultancy for Risk Mapping and Analysis
Country : South Sudan
Target areas :
PlayMatters target locations in South Sudan. Specifically:
Duration : 25 days
Proposed period :
START DATE: 1st October 2026
END DATE: 31st December 2026
Reporting : Project Team Lead with technical backstopping from EiE Technical Advisor.
PlayMatters 3.0 (2026–2030) is a four-year education initiative implemented by the International Rescue Committee (IRC), Plan International and War Child Alliance in Ethiopia, South Sudan and Uganda. The programme aims to improve the well-being and holistic learning outcomes of pre-primary and primary school-aged children, including children affected by conflict and crisis, by strengthening education systems to deliver quality education through Learning through Play (LtP).
PlayMatters has three outcomes. Outcome 3 focuses on protecting children’s holistic development during acute crises. Its Crisis Modifier (CM) provides a flexible mechanism for preparedness, anticipatory action, rapid multisectoral response and transition, while keeping a clear link with the programme’s longer-term education systems work.
The CM is not intended to replace existing government or humanitarian response mechanisms. It is designed to work with them and to allow PlayMatters country teams to act quickly when a significant shock or deterioration affects children, education services or the wider conditions needed for learning and well-being.
The first phase of the CM risk work is a country-level consultative risk mapping and analysis. This phase will establish a clear, evidence-informed understanding of the priority shocks and stresses affecting PlayMatters operational areas, their geographic and population impacts, existing capacities and key gaps. It will build on existing government, humanitarian/cluster, inter-agency, IRC-led and other relevant risk and early-warning analysis rather than creating parallel assessments. The findings will provide the country-specific evidence base for the subsequent development of triggers, indicators and response options in a later phase.
The purpose of this consultancy is to establish a clear, evidence-informed understanding of the priority shocks and stresses that may affect children, education services and holistic well-being in PlayMatters target areas in South Sudan. The analysis will draw on existing risk assessments, vulnerability and hazard analysis, conflict and climate information, displacement and disease data, preparedness documentation, and relevant early-warning and coordination information, complemented by targeted consultations where additional information is required.
The consultancy will provide the South Sudan PlayMatters country team with a validated understanding of the main risks, where and who is most likely to be affected, the potential implications for education and children’s well-being, existing capacities and preparedness arrangements, and key gaps requiring attention.
The findings will provide the evidence base for subsequent Crisis Modifier preparedness work and the development of the country Trigger & Response Matrix.
3.Specific Objectives
4.Scope of the Assignment
4.1. Inception and planning
4.2. Risk mapping and analysis
4.3. Risk mapping report
Note: The report should clearly identify the priority risks, the evidence and data sources supporting their prioritization, relevant existing risk monitoring and early-warning information, geographic and population impacts, existing capacities and key gaps, and any areas requiring further analysis providing the evidence base for the subsequent assignment which will focus on the development of triggers, early-warning indicators, thresholds and response options.
The consultant should use a mixed-method, participatory approach.
It is important to take note that in this assignment, the consultant is not expected to develop activation triggers, trigger thresholds, early-warning indicators or response options. The existing risk monitoring and early-warning information should only be reviewed and documented as part of the risk analysis, leaving conversion into trigger thresholds or activation criteria to the subsequent assignment.
No. 1
Key Output: Inception Report
Content : Methodology; geographic and stakeholder scope; data/source mapping; consultation plan; analytical framework; workplan; identified information gaps and proposed approach to addressing them.
Timing : 6
No. 2
Key Output : Country Risk Mapping and Analysis
Content : Priority shocks and stresses; risk prioritization; geographic and population impacts; seasonality; existing capacities on preparedness and existing response arrangements; key gaps; supporting evidence and data sources.
Timing : 6
No. 3
Key Output : Draft Country Risk map/ matrix and Risk Analysis and Mapping Report
Content : Priority shocks and stresses; risk prioritization; country-level priority risk map/matrix, geographic and population impacts; relevant data sources; existing risk monitoring and early-warning arrangements; capacities and gaps. The draft report should be shared for review with the PMC, Regional EiE Adviser.
Timing : 6
Key Output : Validation Meeting/Workshop with PMCs
Content : Validation session, documented feedback and final country, risk Matrix.
Timing : 2
No. 4
Key Output : Final Country Risk Analysis, Mapping Report
Content : Final validated country Risk Matrix and Risk Analysis and Mapping Report incorporating review and validation feedback; recommendations for periodic review and updating (of risks and their prioritization thereof); concise identification of key evidence, information gaps and considerations to inform the subsequent work on triggers and response options.
Timing : 5
Total Days 25
The consultant will report to the PlayMatters Country PMC Lead in the assigned country.
The Regional Education in Emergencies Adviser will provide technical oversight and quality assurance.
The consultant will work closely with the country Outcome 3/Crisis Modifier focal point and relevant consortium technical colleagues.
The PMC will facilitate access to relevant country and sub-national stakeholders, programme information and existing plans, and support scheduling of consultations.
The Regional EiE Adviser will provide technical guidance; review key deliverables; support resolution of methodological issues; and provide final technical quality assurance.
The consultant will participate in a start-up briefing, agreed progress check-ins, validation and a close-out discussion with PMCs.
Draft deliverables should be shared with the PMC Lead and Regional EiE Adviser before finalization.
The consultant is responsible for the quality and integrity of the analysis and should clearly distinguish evidence-based findings from stakeholder perceptions or assumptions.
The consultancy will be considered successful when:
Relevant INEE Minimum Standards and applicable humanitarian standards should inform the analysis and response planning
Duration: 25 consultancy days, including preparation, consultations, analysis, drafting, validation and finalization.
Location: Travel to agreed PlayMatters target locations.
Interested individual consultants should submit: Interested individual consultants or firms should submit:
Professional Standards: All International Rescue Committee workers must adhere to the core values and principles outlined in IRC Way - Standards for Professional Conduct. Our Standards are Integrity, Service, Equality and Accountability. In accordance with these values, the IRC operates and enforces policies on Safeguarding, Conflicts of Interest, Fiscal Integrity, and Reporting Wrongdoing and Protection from Retaliation. IRC is committed to take all necessary preventive measures and create an environment where people feel safe, and to take all necessary actions and corrective measures when harm occurs. IRC builds teams of professionals who promote critical reflection, power sharing, debate, and objectivity to deliver the best possible services to our clients.

The International Rescue Committee responds to the world’s worst humanitarian crises and help people to survive, recover, and gain control of their future.
Founded in 1933 at the request of Albert Einstein, the IRC offers lifesaving care and life-changing assistance to refugees and displaced people forced to flee from war or disaster.
At work today in over 50+ countries and in 28 U.S. cities, the IRC restores safety, dignity and hope to millions who are uprooted and struggling to endure.