FST Technical Services

Senior Electrical Commissioning Project Engineer-Data Center Construction

FST Technical Services  •  $130k - $170k/yr  •  Atlanta, GA (Onsite)  •  3 hours ago
Apply
AI can make mistakes so check important info. Chat history is never stored.

Job Description

Lead the Systems That Power Critical Infrastructure

At FST Technical Services, we ensure the most complex facilities in the world perform exactly as designed. From data centers to advanced manufacturing environments, our work sits at the intersection of engineering precision and real-world execution.

We are looking for a Senior Electrical Commissioning Project Engineer who can lead from the front, solve complex technical challenges, and drive commissioning outcomes in high-stakes environments.

Why This Role Stands Out

This is not a checklist-driven commissioning role.

This is a position for someone who:

  • Owns outcomes, not just tasks
  • Understands systems holistically, not in silos
  • Can operate independently while leading others

You will play a direct role in ensuring critical systems are designed correctly, installed properly, and perform under real-world conditions.

What You’ll Do

Project Leadership & Execution

  • Lead commissioning activities across the full project lifecycle
  • Execute and oversee functional testing, factory witness testing, and on-site validation
  • Manage multiple assignments while maintaining schedule, budget, and quality expectations
  • Interpret contract documents to identify risks and opportunities

Technical Expertise & Problem Solving

  • Evaluate electrical distribution systems and building system interconnectivity
  • Troubleshoot system performance issues in real time
  • Review design documentation and submittals

Client & Stakeholder Engagement

  • Lead commissioning meetings and communicate findings
  • Serve as a trusted partner to clients and contractors

Operational Contributions

  • Complete field reports, documentation, and time management
  • Support scheduling and revenue targets

Team Development

  • Mentor junior engineers and support training initiatives

What You Bring

Core Qualifications

  • Electrical Engineering degree or Qualified Electrician background
  • 7+ years in electrical systems OR 3+ years commissioning
  • Data center or mission-critical experience

Technical Capabilities

  • Experience with electrical distribution, HVAC systems, controls, fire alarm, and automation
  • Ability to read construction drawings and specifications

Professional Skills

  • Strong analytical and communication skills
  • Ability to lead meetings and manage multiple priorities

Physical Requirements

  • Ability to work in field environments, climb ladders, and lift ~30 lbs

Preferred

  • EIT, CEM, LEED, OSHA 30, BIM experience

Travel Requirements

Regular travel to project sites with potential for broader U.S. travel. Must be able to work on-site as required.

Why FST

At FST, you are part of a team that values execution, accountability, and expertise. Strong performers are recognized, and engineers have opportunities to grow into leadership roles.

Salary range: $130,000-$170,000 - based on experience

FST Technical Services

About FST Technical Services

Life Cycle Testing, Inspection, Certification & Engineering Solutions for Mission Critical Facilities Worldwide

Commitment to Diversity – FST is dedicated to non-discriminatory practices in employment and opportunity due to race, color, religion, creed, national origin, ancestry, disability, sex or age.

FST is committed to creating and maintaining a workplace in which all employees have an opportunity to participate and contribute to the success of the business and are valued for their skills, experience, and unique perspectives. This commitment is embodied in company policy and the way we do business at FST and is an important principle of sound business management.

Industry
Manufacturing & Production
Company Size
201-500 employees
Headquarters
Chandler, AZ
Year Founded
1984
Social Media