NorthMark Strategies

Senior Construction Scheduler – Heavy Industrial Projects

NorthMark Strategies  •  Spartanburg, SC (Onsite)  •  4 hours ago
Apply
AI can make mistakes so check important info. Chat history is never stored.

Job Description

The Company

NorthMark Compute & Cloud (NMC²) is backed by dedicated leadership and investment, with a clear mission as it operates at the bleeding edge of technology. Its goal is to scale and enhance the high-performance computing (HPC) and cloud infrastructure that supports its clients' research, production, and delivery, enabling breakthroughs that shape the industries of tomorrow. Its engineers build critical infrastructure to eliminate friction in scientific research, simulations, analysis, and decision-making, accelerating discovery and driving faster innovation.

The Position

NorthMark Compute & Cloud (NMC²) is seeking a Senior Construction Scheduler to own the integrated schedule for its High Performance Computing facility program, with an initial focus on delivery of our Spartanburg-based facility. Schedules for supply chain, design deliverables, decision gates, meetings, and data hall (DH) delivery are developed and tracked across many teams and partners today. This role consolidates them into a single, authoritative source of truth in which every dependency is visible and owned. This role reports to the Director, Infrastructure Enablement.

Beyond maintaining the schedule, this role provides independent, owner-side scrutiny of our external delivery partner's schedule, including forensic analysis of updates and delay events, so that problems are forecast and addressed before they reach the critical path. This is a hands-on technical role that works through influence and analytical rigor, partnering closely with engineering, procurement, construction, and project controls.

Responsibilities

  • Own the integrated master schedule across all program phases, linking supply chain and long-lead deliveries, design and engineering deliverables, decision gates, construction, commissioning, and DH turnover into a single source of truth
  • Establish and enforce scheduling standards, including WBS and activity coding, update cadence, baseline control, and revision management, across internal teams and external partners
  • Review the EPCM partner's baseline schedule, monthly updates, and recovery plans for logic quality, sequencing, constraints, float, and contract compliance; issue written comments and require resubmission where standards are not met
  • Perform forensic schedule analysis on partner updates and milestone variances, including delay and time impact analysis (e.g., windows method) on proposed changes, to establish causation, concurrency, and entitlement
  • Forecast schedule risk through critical and near-critical path monitoring, look-ahead analysis, and what-if scenarios; surface emerging issues early with recommended actions
  • Track cross-workstream dependencies and handoffs (e.g., design freeze to procurement release, delivery to installation, installation to commissioning) and hold owners accountable for dates
  • Prepare variance reporting and recovery plan assessments, and support program leadership in holding delivery partners to commitments
  • Build and maintain schedule dashboards and executive reporting (Power BI or equivalent) in coordination with the Director, Infrastructure Enablement
  • Work with Project Controls to integrate cost and schedule data, and support change evaluation with schedule-impact analysis
  • Validate reported progress through regular monthly site visits and field walks
  • Capture schedule lessons learned from each DH and phase to improve baselines, durations, and sequencing on future capital programs

Requirements

  • Bachelor's degree in construction management, engineering, or a related field, or equivalent experience
  • 5-7 years of construction scheduling experience on heavy industrial, power, mission-critical, or data center projects, including large multi-contractor programs
  • Expert proficiency in construction management software's, including resource and cost loading, baseline management, and schedule quality assessment (i.e Oracle Primavera P6)
  • Demonstrated experience performing forensic schedule analysis and time impact analysis, and communicating findings to contractors and senior leaders
  • Experience reviewing and challenging contractor or EPC/EPCM schedules from the owner's side, or as an independent reviewer
  • Working knowledge of dashboarding tools (Power BI or equivalent) and earned value concepts
  • Proven ability to drive accountability across teams and external partners without formal authority
  • Strong written and verbal communication skills, with the ability to turn complex schedule data into clear executive-level insight
  • Preferred: PSP or PMI-SP certification; experience with high-voltage electrical or heavy mechanical construction and commissioning sequences; experience in a fast-track, schedule-driven program

It is impossible to list every requirement for, or responsibility of, any position. Similarly, we cannot identify all the skills a position may require since job responsibilities and the Company’s needs may change over time. Therefore, the above job description is not comprehensive or exhaustive. The Company reserves the right to adjust, add to or eliminate any aspect of the above description. The Company also retains the right to require all employees to undertake additional or different job responsibilities when necessary to meet business needs.

Must be legally authorized to work in the United States without the need for employer sponsorship, now or at any time in the future.

Benefits & Perks:

  • Company-Paid Lunch Stipend: Lunch is provided via GrubHub
  • Company-Paid Benefits: 100% Employer-Paid Medical in our High Deductible Health Plan, Dental and Vision benefits for employees and their families, 16 weeks of Paid Parental Leave, Employee Assistance Program, Life insurance, Short-Term Disability and Long-Term Disability
  • 401(k): Company will match 100% of your contributions up to 6%
  • Optional Employee-Paid Benefits: Medical insurance in our PPO plan and a variety of other benefits such as Health Savings Accounts (with Company Contribution!), Flexible Spending Accounts, Supplemental Life Insurance, Wellhub and more.
  • Time Off: 25 days of Paid Time Off plus 12 company holidays

EQUAL OPPORTUNITY EMPLOYER

NORTHMARK STRATEGIES LLC IS AN EQUAL EMPLOYMENT OPPORTUNITY EMPLOYER. THE COMPANY'S POLICY IS NOT TO DISCRIMINATE AGAINST ANY APPLICANT OR EMPLOYEE BASED ON RACE, COLOR, RELIGION, NATIONAL ORIGIN, GENDER, AGE, SEXUAL ORIENTATION, GENDER IDENTITY OR EXPRESSION, MARITAL STATUS, MENTAL OR PHYSICAL DISABILITY, AND GENETIC INFORMATION, OR ANY OTHER BASIS PROTECTED BY APPLICABLE LAW. THE FIRM ALSO PROHIBITS HARASSMENT OF APPLICANTS OR EMPLOYEES BASED ON ANY OF THESE PROTECTED CATEGORIES.

NorthMark Strategies

About NorthMark Strategies

NorthMark Strategies is a leading investment firm, combining capital, innovation, and engineering to drive long-term value. From operating complex businesses to backing breakthrough technologies, our mission is to build enduring businesses. Our team combines intelligent risk-taking, operational excellence, exceptional talent, and world-class computing capacity to create shareholder value.

Our company offers a dynamic environment where individuals have the freedom to lead companies toward bold achievements by embracing innovation, leveraging technology, and fostering differentiated business strategies. Our values are Integrity, Ability, and Energy, and the company aims to hire individuals who possess those qualities.

At NorthMark Strategies, we believe the future isn’t something to hope for, it’s something to build. We don’t just invest, we create. Bringing together strategic insight and technical horsepower to deliver outcomes that endure.

Our company’s mission is to integrate world class investments, operational excellence, and exceptional talent.

Our values are Integrity, Ability, and Energy, and the company aims to hire individuals who possess those qualities.

Our company offers a dynamic environment where individuals have the freedom to lead companies toward bold achievements by embracing innovation, leveraging technology, and fostering differentiated business strategies. We provide individuals with the opportunity to extend beyond boundaries and be in an optimal position to unlock exceptional value and drive unprecedented growth.

Industry
Finance & Insurance
Company Size
201-500 employees
Headquarters
Unknown
Year Founded
Unknown
Social Media