Procon Consulting

Senior Construction Scheduler - Federal Sector

Procon Consulting  •  Washington, DC (Remote)  •  4 days ago
Apply
AI can make mistakes so check important info. Chat history is never stored.

Job Description

Procon is a top-ranked construction management and technology consulting firm with 25 years of experience delivering high‑impact projects across the U.S. and worldwide. An ENR Top 100 CM/PM firm for five consecutive years, we specialize in program management, project controls, commissioning, and technology—and offer an excellent platform to grow your career while shaping the future of the built environment.

Procon seeks a Senior Scheduler. This role requires various skills and experience as listed below.

This position does not offer employment visa sponsorship. Candidates must be authorized to work in the United States without current or future sponsorship.

Qualifications and Skills

  • Expertise in Primavera P6 with demonstrated proficiency in building and analyzing Critical Path Method (CPM) schedules.
  • Minimum of 10 years of experience in construction scheduling, with a strong track record in CPM methodologies.
  • Deep understanding of federal government construction processes, including contracts, design documents, and specifications.
  • Experience supporting vertical construction, utility, and infrastructure projects.
  • Familiarity with large-scale or complex scheduling environments, including development and assessment of Integrated Master Schedules and detailed analysis of TIAs and COs.
  • Strong verbal and written communication skills for effective stakeholder engagement and reporting.
  • Bachelor’s degree required in construction management, engineering, or a related field.
  • Preferred but not required: certifications in scheduling, general contractor experience, and working knowledge of Microsoft Project (MSP), Schedule Validator, Primavera Risk Analysis, or a relevant master’s degree.

Responsibilities and Duties

  • Develop and manage complex Integrated Master Schedules (IMS), including look-ahead planning and “what-if” scenario modeling.
  • Evaluate construction schedules for compliance, performance, and risk, including thorough assessments of Time Impact Analyses (TIA) and Change Orders (CO).
  • Collaborate cross-functionally to align scopes of work across concurrent projects.
  • Deliver timely and insightful reporting by synthesizing data from various sources and communicating scheduling impacts across program stakeholders.
  • Participate proactively in project lifecycle activities—such as design reviews, procurement strategy sessions, and coordination meetings—to maintain a deep understanding of project and program dynamics.
  • Provide onsite support when needed, with occasional travel and the potential to work from alternate project offices in the future.

Salary commensurate with experience.

Interested and qualified candidates please submit a cover letter and a resume.

Procon offers competitive salaries and a comprehensive benefits package, including full medical/dental insurance and 401(K) plan. Procon is an equal opportunity employer and considers qualified applicants for employment without regard to race, gender, age, color, religion, disability, veteran status, sexual orientation, or any other protected factor

Procon Consulting

About Procon Consulting

Procon Consulting is a top-ranked construction management and technology consulting firm headquartered in the Washington D.C. area. For 25 years, we’ve led high-impact projects across 46 states and around the globe for government and commercial clients.

As an ENR Top 100 CM/PM firm five years running, our expertise spans program management, project controls, commissioning, BIM, and 3D digital twins. We combine cutting-edge technology with a commitment to preserving the past and building a resilient future. Our podcast, The Build Up, invites like-minded leaders to share bold ideas that inspire innovation in the AEC industry.

Driven by our core values—service, excellence, integrity, and teamwork—Procon is shaping the future of the built environment.

Industry
Consulting & Advisory
Company Size
201-500 employees
Headquarters
McLean, Virginia
Year Founded
2000
Social Media