Medcor

Safety Professional – Data Center Construction (Short-Term Project)

Medcor  •  $45/hr  •  The Dalles, OR (Onsite)  •  3 hours ago
Apply
AI can make mistakes so check important info. Chat history is never stored.

Job Description

Location: The Dalles, OR Compensation: $45.00/hour (W2) Per Diem: $980/week Schedule: Monday–Friday, 4:00 PM – 2:00 AM | Approximately 50 hours per week Anticipated Start Date: Mid-December 2026 Project Duration: Approximately 4–5 months Project Type: Data Center Construction (General Contractor) Position Overview Medcor Safety, a subsidiary of Medcor, is seeking an experienced Safety Professional for a short-term data center construction project in The Dalles, Oregon. This position will support onsite safety operations, identify and mitigate workplace hazards, and work closely with construction crews, subcontractors, and project leadership to maintain a safe and compliant work environment. The ideal candidate will have a strong background in construction safety, excellent communication skills, and the ability to work independently in a fast-paced construction environment. Previous experience supporting large-scale commercial, industrial, or data center construction projects is highly desirable. Key Responsibilities Conduct regular site safety inspections and audits to identify potential hazards and unsafe work practices. Work collaboratively with field personnel, subcontractors, and project management to address safety concerns and implement corrective actions. Monitor compliance with OSHA regulations, site-specific safety plans, and applicable federal, state, and local requirements. Review and maintain safety documentation, inspection reports, and employee training records. Participate in safety meetings, project kickoff meetings, and daily safety discussions. Assist with the development and implementation of site-specific safety plans and procedures. Support incident investigations, accident reporting, and corrective action recommendations. Review client and general contractor safety requirements to ensure compliance throughout the project. Promote a proactive safety culture through employee engagement, coaching, and ongoing communication. Maintain positive working relationships with site leadership, construction crews, and outside agencies. Required Qualifications Minimum of 5 years of relevant construction safety experience. OSHA 30-Hour Construction certification required. Current CPR/First Aid certification required. Strong understanding of OSHA construction standards and jobsite safety practices. Experience conducting site inspections, safety audits, and incident investigations. Excellent written and verbal communication skills. Ability to work independently and effectively with construction teams and project leadership. Proficiency with Microsoft Office, including Word, Excel, and email. Ability to work the designated afternoon/evening schedule. Preferred Qualifications Construction Health and Safety Technician (CHST) certification. OSHA 500 certification. Previous experience supporting data center construction projects. Experience working on large-scale commercial or industrial construction sites. Familiarity with general contractor safety programs and site-specific compliance requirements. Physical Requirements This position requires regular walking and standing throughout an active construction site, as well as bending, squatting, climbing stairs and ladders, and working on elevated platforms. Candidates must be able to lift up to 50 pounds occasionally and possess the visual and physical abilities necessary to perform jobsite safety inspections. Why Join Medcor Safety? Medcor Safety provides experienced safety professionals to construction and industrial projects across the country. Our team works alongside leading contractors to support safe working environments and maintain high standards of workplace safety. This opportunity offers competitive hourly compensation, weekly per diem, and the ability to contribute to a large-scale data center construction project. Medcor is a tobacco-free and smoke-free workplace. EOE/M/F/Vet/Disability We are an equal opportunity employer, and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity or expression, pregnancy, age, national origin, disability status, genetic information, protected veteran status, or any other characteristic protected by law. #indeedsponsored

Medcor

About Medcor

Medcor simplifies the healthcare process for employers. How? By providing the right level of care at the right time and in the right place. When employees get the treatment they need, they avoid unnecessary procedures, labs, prescriptions and referrals. Employers also avoid claims-driven activities that increase costs and recordables. Medcor can provide 24/7 coverage through onsite, mobile, triage and telehealth services. On-demand access thanks to our availability allows early intervention; our use of evidence-based medicine supports prevention and treatment. This holistic approach—and that Medcor operates without claims-driven conflicts of interest—is a win for employers.

Medcor is proud to serve clients across the U.S. and Canada, in nearly every industry including Manufacturing; Distribution; Food Processing; OCIP and CCIP Construction; Pharmaceuticals; Retail; Renewables; Insurance; and Hospitality and Entertainment.

Industry
Healthcare & Social Services
Company Size
1,001-5,000 employees
Headquarters
McHenry, Illinois
Year Founded
1984
Social Media