Huston-Tillotson University - Austin, Texas

Request for Proposals - Elevator

Huston-Tillotson University - Austin, Texas  •  Austin, TX (Onsite)  •  4 months ago
Apply
AI can make mistakes so check important info. Chat history is never stored.

Job Description

Job Location Huston-Tillotson University - AUSTIN, TX 78702

Request for Proposals (RFP)

Elevator Modernization Services
Huston‑Tillotson University
900 Chicon Street, Austin, Texas 78702

1. Introduction and Purpose

Huston‑Tillotson University (HT) hereby invites qualified elevator modernization contractors to submit proposals for the modernization of two (2) existing hydraulic passenger elevators located on the University’s main campus in Austin, Texas.

This project is funded by the U.S. Department of Education and is therefore subject to all applicable federal grant regulations, including but not limited to 2 CFR Part 200 (Uniform Guidance), institutional procurement policies, and applicable state and local laws.

Elevators Included

  • Jackson‑Moody Building – One (1) hydraulic passenger elevator
  • Dickey‑Lawless Building – One (1) hydraulic passenger elevator

2. Project Location

Huston‑Tillotson University

900 Chicon Street

Austin, TX 78702

3. Project Background

The elevators in the Jackson‑Moody and Dickey‑Lawless buildings are aging hydraulic units that require comprehensive modernization to:

  • Improve reliability and operational performance
  • Bring systems into compliance with current ASME A17.1 Safety Code and safety requirements
  • Enhance safety, accessibility, and lifecycle sustainability

4. Scope of Work (General Requirements)

The selected contractor shall provide turn‑key elevator modernization services, including labor, materials, equipment, engineering, permitting, testing, inspections, and coordination.

4.1 General Modernization Requirements (Both Elevators)

The proposed modernization shall include, at a minimum:

A. Machine Room and Hoistway

  • New solid‑state elevator controller suitable for hydraulic application
  • New submersible hydraulic power unit (tank, motor, pump, valve assembly, oil)
  • New landing system
  • Replacement of machine room and hoistway wiring
  • New traveling cable
  • New hoistway switches
  • Retention of existing rails and rail fastenings where structurally acceptable

B. Elevator Car Equipment

  • New car guide assemblies
  • New top‑of‑car inspection station
  • Retention of existing car enclosure and platform, unless otherwise proposed

C. Car Operating Fixtures and Controls

  • New car operating panel (COP)
  • Illuminated car call pushbuttons
  • Door open/close pushbuttons
  • Emergency stop and alarm systems
  • Independent service and firefighter service controls
  • Digital position indicator
  • Voice annunciation system
  • Two‑way hands‑free emergency communication system
  • Emergency lighting and alarm bell
  • Safety compliant braille and tactile signage

D. Doors and Entrances

  • New car door operator
  • New door track, header, hanger assemblies
  • Infrared door protection system
  • New door interlocks and gibs
  • Retention of existing entrance frames and panels where feasible

E. Hallway Fixtures

  • New hall call stations at each landing
  • Illuminated hall pushbuttons
  • Fire Service Phase I key switches
  • ADA‑compliant jamb braille plates

F. Elevator Pit Equipment

  • New pit stop switch
  • Code‑compliant pit ladder
  • New packing
  • Refurbishment or replacement of buffers as required
  • Retention of existing cylinder and piston if serviceable

5. Associated Building and Trade Work

Proposals shall include coordination (and pricing, if provided by the contractor) for work typically required in conjunction with elevator modernization, including:

  • Electrical disconnects and conduit
  • Machine room lighting and GFCI receptacles
  • Fire‑rated machine room door installation
  • Fire stopping and caulking
  • Fire alarm system disconnect, reconnection, testing, and final acceptance with the Authority Having Jurisdiction (AHJ)
  • Pit lighting and electrical upgrades

Contractors must clearly state what work is self‑performed, subcontracted, or excluded.

6. Optional Alternates

Proposers may include add‑alternate pricing for:

  • Elevator cab interior upgrades (wall panels, ceiling, lighting, handrails)

Alternates should be clearly identified and separately priced

7. Project Schedule

  • Work shall be performed during normal business hours (Monday–Friday) unless otherwise approved.
  • Proposer shall include:
    • Submittal and approval timeline
    • Manufacturing lead time
    • Installation time per elevator
  • Work must be sequenced to maintain campus accessibility.

8. Compliance and Standards

All work must comply with:

  • ASME A17.1 / CSA B44 – Safety Code for Elevators
  • National Electrical Code (NEC)
  • Texas Department of Licensing and Regulation (TDLR)
  • Local AHJ requirements
  • U.S. Department of Education grant compliance requirements



Qualifications

9. Contractor

Qualifications

Proposers must demonstrate:

  • Minimum five (5) years experience in elevator modernization
  • Licensed to perform elevator work in Texas
  • Experience with higher‑education or publicly funded projects
  • Ability to comply with federal grant procurement standards
  • Proof of insurance and bonding capacity

10. Proposal Submission Requirements

Proposals shall include:

  1. Executive

    Summary
  2. Technical Approach and Scope Compliance
  3. Detailed Project Schedule
  4. Cost Proposal (base bid and alternates)
  5. Company

    Qualifications and References
  6. Compliance Statements (ASME, DOE funding, etc.)
  7. Exceptions or Clarifications
  8. Warranty Information

11. Evaluation Criteria

Proposals will be evaluated based on:

  • Technical compliance with scope
  • Cost effectiveness
  • Contractor experience and qualifications
  • Schedule feasibility
  • Responsiveness and clarity

HT reserves the right to reject any or all proposals.

12. Funding and Payment

This project is funded by the U.S. Department of Education

Payment terms will be subject to:

  • Grant compliance requirements
  • University procurement policies
  • Satisfactory performance and documentation

13. Submission Instructions

Proposal Due Date: February 8, 2026
Submission Method: Electronic: krcrawford@htu.edu

Contact Person: Dr. Kenneth Crawford, Chief Operations Officer

Ph: 512.505.3003

Email: krcrawford@htu.edu

Huston-Tillotson University - Austin, Texas

About Huston-Tillotson University - Austin, Texas

Huston-Tillotson University, Austin's only HBCU and oldest institution of higher learning, is a fully-accredited University under the leadership of Dr. Melva K. Wallace, President and CEO. Huston-Tillotson's vision is that "Huston-Tillotson University commits to cultivating the forerunners of innovation. We aspire to

prepare graduates who are pioneers, socially engaged leaders and thinkers, demonstrated through academic excellence and service."

Industry
Government & Public Safety
Company Size
51-200 employees
Headquarters
Austin, Texas
Year Founded
1875
Website
htu.edu
Social Media