Job Description
Group Company: Metro Pacific Tollways South Management Corporation
Designation: Quantity Surveying and Cost Engineer
Office Location: General Trias, Cavite
Primary Responsibilities:
Pre-Construction Stage (As-Needed Basis)
- Assist in the preparation of initial feasibility studies and projected project cost models.
- Track ongoing design variations and update the budget to reflect cost adjustments.
Construction Stage
- Perform comprehensive drawing interpretations and precise material quantity take-offs.
- Conduct site measurements and gather joint verification data to evaluate the value of work completed by the contractor.
- Evaluate contractor cost proposals, claims, and variations against contract provisions.
- Prepare detailed in-house cost estimates for issued Site Instructions (SI).
- Review and verify the contractor’s monthly progress billings and accomplishments.
- Formulate Detailed Unit Price Analysis (DUPA) for new and non-vetted pay items.
- Manage and archive project cost records, contracts, and financial documents in both physical hard copies and digital formats.
Project Close-Out Stage
- Reconcile and finalize the variation order logs and final account accounts with contractors.
- Validate the contractor's final progress billing and statement of accounts against actual site completion.
- Verify final material balances, retention sum releases, and formal project close-out documentation.
- Prepare the final cost reconciliation report comparing the initial budget against actual expenditures.
Qualifications:
- Course: Graduate of Civil or Electrical Engineering course
- Experience: ·Minimum of 1 to 2 years of proven experience in quantity surveying, cost engineering, or project controls within the construction industry)
- Willing to work 6 days a week.
- Licenses (ifapplicable): with or without a PRC license