The Weitz Company

Quality Control Inspector - Data Center Construction

The Weitz Company  •  Richmond, VA (Onsite)  •  44 minutes ago
Apply
AI can make mistakes so check important info. Chat history is never stored.

Job Description

The Weitz Company is hiring a Quality Control Inspector to work on data center projects for the Mission Critical division.

What You’ll Do:

  • Understand project scope and quality requirements, contract documents, site drawings, manufacturer product data/manuals and company quality plan and standards; ensure project is constructed accordingly
  • Schedule, conduct and evaluate various site inspections, quality monitoring and surveillance of daily and upcoming work (i.e. first work, follow up, regulatory agency, underground utility, concrete pour, material, off-site, final rough-in)
  • Prepare inspection and test plans; document testing, measurements, inspection reports and other quality reports; maintain necessary quality-related files and compile necessary documents for project turnover to owner
  • Identify and report non-conforming work; track on non-conformance log; assist with issuing related reports
  • Oversee development and review of daily construction reports, field observation reports, punch lists, quality reports and as-built drawings
  • Stay abreast of federal, industry and company standards; educate project teams of compliance requirements and changes
  • Partner with project safety team to determine hazards and identify needs or processes to remedy; proactively eliminate or minimize identified hazards
  • Ensure inspections, observations and punch list are documented and stored in accordance to company policy
  • Monitor project site adherence to company quality plan and standards; propose updates or modifications to management for review
  • Utilize virtual and physical mock-ups to establish quality standards and identify lean processes to improve field productivity
  • Establish and maintain working relationships with owners, architects, subcontractors, vendors and internal team members to ensure company quality plan is adhered to
  • Perform other duties as assigned

What We’re Looking For:

  • Experience:
  • A minimum of three (3) years of construction-related experience is required
  • Construction field experience is preferred. Experience in a fast-paced environment
  • LEAN principles experience is desirable
  • Data center experience is strongly preferred
  • Skills:
  • Excellent verbal and written communication
  • Ability to balance and prioritize projects with impending deadlines
  • Detail-oriented and highly organized Business acumen and relationship-building skills
  • Technology:
  • Candidate should have experience with Microsoft Office Suite, Apple products (iPhone & iPad) and have the ability to learn specific software.
  • Solid systems experience with Procore and Bluebeam is preferred.
  • Training will be provided on company standards.

What We Offer:

  • Competitive Pay
  • Rewarding Bonus Program
  • Comprehensive Benefits Package with Tax-Advantaged HSA and FSA offerings
  • Employer-Paid Short- and Long-Term Disability Programs
  • Employer-Paid Life Insurance
  • Generous Paid Time Off Provisions
  • 401K Retirement Savings Plan with Company Match
  • Tuition Reimbursement
  • Fully Paid Parental Leave
  • Voluntary Products Including: Critical Illness Insurance and Accident Insurance
  • Corporate Wellness Program with Wellness Time Off and Rewards

#LI-MR1

#DataCenter

Visa sponsorship is not available for this position at this time.

The Company does not accept unsolicited resumes from search firms or agencies. Any resume submitted to any employee of the Company without a prior written search agreement will be considered unsolicited and the property of the Company. Please, no phone calls or emails.

The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates) recognizes the value of and is committed to hiring and retaining a diverse and inclusive workforce. We are an Equal Opportunity Employer and follow applicable affirmative action guidelines and policies. All qualified applicants will receive consideration for employment (including minorities, females, veterans, and individuals with disabilities, regardless of sexual orientation, gender identity, or other protected categories in accordance with applicable ​state and federal laws). The Company is a drug and alcohol-free workplace and background checks are required if applicable. Click here to review our Privacy Notice.

By providing your mobile phone number and submitting an application, you consent to receive SMS text messages from The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates, including EPI, Power LLC) regarding employment-related communications, which may include appointment reminders and occasional updates. Message frequency may vary, but will generally be 2–4 messages per month. Message and data rates may apply according to your mobile carrier plan.

You may reply “STOP” to opt out or “HELP” for assistance at any time. Consent to receive SMS messages is not a condition of employment.

The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates, including EPI, Power LLC) does not sell, share, or rent mobile phone numbers or personal information collected through SMS messaging for marketing purposes. Your mobile number will be used solely for SMS communications that you have voluntarily opted to receive.

The Weitz Company

About The Weitz Company

The Weitz Company, a subsidiary of Orascom Construction PLC, is a full-service construction company, general contractor, design-builder and construction manager with office locations throughout the United States.

Founded in 1855, Weitz is one of the oldest commercial general contractors and consistently ranks among the top firms on Engineering News-Record’s list of the Top 400 Contractors.

Serving customers throughout the industrial and commercial sectors, our design-build construction capabilities set us apart from our competitors. Design-build construction means we work closely with our clients to envision their projects from the initial plans all the way through completion. This means they have a single point of contact throughout the entire process, ensuring the smoothest process and highest-quality finished product.

With more than 100 years of family ownership in our history, clients know they can count on us to deliver the highest levels of integrity and professionalism. We’re proud to be a general contractor firm with a strong reputation for delivering on our promises and standing behind our work. This is why more than 75% of our business comes from repeat customers.

Industry
Construction & Skilled Trades
Company Size
1,001-5,000 employees
Headquarters
Des Moines, IA
Year Founded
1855
Website
weitz.com
Social Media