Project
The Woodfibre LNG Project is located approximately 7 km west-southwest of Squamish, British Columbia. It involves the construction and operation of a liquefied natural gas (LNG) export facility on the previous Woodfibre pulp mill site, which would have a storage capacity of 250,000 m3 and would produce approximately 2.1 million tons per year of LNG.
Woodfibre Management Ltd. is a privately held Canadian company based in Vancouver and a subsidiary of Pacific Energy Corporation Limited.
Position
The Project Engineer is an integral part of Woodfibre LNG's dynamic team. Reporting to the Head of Engineering Support, this position is responsible for establishing and executing the sustaining capital project delivery approach for the operating facility, ensuring facility modifications are safely planned, engineered, constructed, and handed back to Operations. Projects at Woodfibre LNG are complex, multi-disciplinary modifications to an operating facility, and require close integration with Operations, Maintenance, HSSE, and Turnaround planning. This role is expected to provide experienced leadership to ensure these projects are executed with strong operational awareness, technical integrity, and minimal impact to ongoing operations.
Key Responsibilities
The successful applicant will:
Requirements
Required Experience
Additional Requirements
Only qualified candidates legally entitled to work in Canada will be contacted.
Woodfibre Management Ltd. is an equal opportunity employer.
Thank you in advance for your interest!
Benefits
Salary range: CAD 100,000 - 125,000 /yr

The Woodfibre LNG Project is operated by Woodfibre Management Ltd, a privately held Canadian company based in Vancouver, British Columbia. The Woodfibre LNG facility is being built on the site of the former Woodfibre pulp mill site, which is located about seven kilometers southwest of Squamish, B.C. on the traditional and unceded territory of the Sḵwx̱wú7mesh Úxwumixw (Squamish Nation).
Woodfibre LNG is the first LNG export facility in the world to commit to achieving net zero emissions by 2027.
During construction, Woodfibre LNG expects a peak workforce of more than 800 individuals, with over 100 long-term operating positions at the facility once construction is complete.
If you are interested in a career at Woodfibre LNG, please visit woodfibrelng.ca/careers