Job Title: Scheduler
Department: Production
Reports to: Plant Manager
Location: Langhorne, PA
The Scheduler is responsible for translating the plant's order book into a daily production schedule that maximizes corrugator utilization, minimizes setup churn, and delivers on customer commit dates. This role sits at the intersection of customer demand, corrugator capacity, and converting line availability — and the decisions made here directly determine whether the plant runs efficiently or reactively.
ND PKG operates a 110" BHC corrugator with full converting lines. Corrugator scheduling is the highest-leverage scheduling function in the plant: run sequence, board combination efficiency, and setup frequency have a direct impact on utilization, waste, and on-time delivery. The Scheduler reports directly to the Plant Manager and coordinates daily with Customer Service, Production, and Shipping.
The actual base pay offered to the successful candidate will be based on multiple factors, including but not limited to job-related knowledge/skills, experience, geographical location, and internal equity. At ND Paper, it is not typical for an individual to be hired at the high end of the range for their role, and compensation decisions are dependent upon the facts and circumstances of each position and candidate.
ND Paper is a leading manufacturer of high-quality pulp, paper, and packaging products in the United States, generating over half a billion dollars in annual sales. As a wholly owned subsidiary of Nine Dragons Paper (Holdings) Limited – the largest containerboard producer in the world – ND Paper is part of a global network committed to excellence and innovation. With two integrated pulp and paper mills in Rumford, Maine and Biron, Wisconsin, a packaging plant in Sturtevant, Wisconsin, and two sheeting facilities in Langhorne, Pennsylvania and Fairmont, West Virginia, the ND Paper family produces nearly one million tons of products annually. Our 1,100 dedicated employees are the heart of our operations, and we are committed to fostering positive work environments where individuals can advance and thrive. At ND Paper, we are investing in our future, and that starts with our staff.
Key Responsibilities & Expected Results
Corrugator Scheduling
Converting Schedule
Order Management & Customer Commit Dates
Expedite Management
Metrics & Reporting
System & Data Integrity
Cross-Functional Coordination
Key Performance Indicators (KPI’s)
Formal targets will be established after a 60–90 day baseline data collection period. Corrugator utilization data from prior shift reports must be reason-coded before KPIs are actionable for performance management.
KPI
Definition
Target / Note
Schedule Attainment
% of scheduled orders completed on the day planned
Baseline TBD — 60–90 day data collection period required before targets are set
Corrugator Utilization
Net footage run as % of available corrugator capacity
Baseline TBD; healthy range typically 65–75% — plant-specific baseline required
Setup Count per Shift
Number of corrugator setups per shift by day
Baseline TBD; excessive setups are primary driver of utilization loss
Average Run Length
Average footage per corrugator run
Baseline TBD; short average run length indicates scheduling fragmentation
Expedite Rate
% of orders requiring schedule pull-in after original release
Baseline TBD; reason coding required — customer-driven vs. plant-driven
Schedule Stability
% of orders that ship on original committed date without rescheduling
Baseline TBD
Lead Time Accuracy
Quoted lead time vs. actual days from order to ship
Baseline TBD; tracked in coordination with Customer Service
Qualifications and Skills
Required
Preferred
Core Competencies (Results based)
Working Conditions
Plant site
PHYSICAL REQUIREMENTS & WORK ENVIRONMENT
Requirement
Detail
Environment
Office setting within or adjacent to the plant; daily floor presence required
Standing / Walking
Regular — floor walks to verify schedule execution and identify production issues
Lifting
Minimal — up to 20 lbs occasionally
PPE
Safety glasses and steel-toed footwear required when on production floor
Schedule Flexibility
Day shift primary; early start may be required to release corrugator schedule before shift startup
WHAT SUCCESS LOOKS LIKE
The scheduling function at ND PKG is currently building its baseline. Success in the first year is defined as bringing structure, visibility, and optimization discipline to a function that directly drives corrugator performance.
Milestone
Expected Outcome
30 Days
Full ownership of daily schedule release for corrugator and converting; standing touchpoint with Customer Service and Production established; KIWI being used as primary scheduling tool
60 Days
Baseline data collection underway for utilization, setup count, and schedule attainment; expedite reason coding active; first corrugator run-length analysis completed
90 Days
Baseline metrics established and reported weekly; scheduling fragmentation drivers identified; corrugator setup count trending in the right direction; lead time accuracy visible
6 Months
Formal KPI targets proposed and approved; scheduling function operating proactively — sequence optimization, run-length discipline, and lead time integrity consistent
Attributes for Success

We are a leading manufacturer of various types of high-quality and sustainable pulp, packaging and paper products.
Our mills in Rumford, Maine and Biron, Wisconsin are integrated paper and pulp facilities, our mill in Fairmont, West Virginia is one of only three in the world that produces air-dried, recycled pulp, and our fourth mill, in Old Town, Maine, produces unbleached softwood kraft and recycled pulp.
Finally, the newest addition to our family, ND Packaging, offers high-quality, sustainable packaging products produced in our state-of-the-art corrugated box plant, in Sturtevant, Wisconsin.
We are proud of our dedicated employees who produce more than 1.2 million short tons of pulp, packaging and paper products annually and together, through innovation and determination, are building the foundations of our 100-year vision.