McKinstry

Preconstruction Project Engineer - Data Center Construction

McKinstry  •  $29.55 - $44/hr  •  Pasco, WA (Onsite)  •  2 hours ago
Apply
AI can make mistakes so check important info. Chat history is never stored.

Job Description

Position at McKinstry Co. , LLC

Build the future, spark innovation and align your career with purpose.

McKinstry is innovating the waste and climate harm out of the built environment and creating lasting impact. Together, we’re building a thriving planet.

Buildings are a leading contributor to the climate crisis, generating nearly 40% of total global energy-related carbon emissions. We’re making a lasting impact on our industry and within our communities by addressing the climate, affordability and equity crises through:

  • renewables and energy services
  • engineering and design
  • construction and facility services

To get where we’re going, we need big thinkers, problem solvers and collaborative mindsets. Does that sound like you?

The Opportunity with McKinstry

We are currently seeking a Preconstruction Project Engineer - Data Center Construction to join the team as a member of our growing Data Center Innovations division in Pasco, WA. Some responsibilities you will have include:

Project Coordination

  • Support Request for Proposal (RFP) and procurement processes.
  • Preconstruction job family is a parallel path with the project management operations job family (i.e. preconstruction manager = project manager). This is to allow team members to gain additional experience in the project life cycle based on needs of the company and development of talent.
  • Must become proficient in conceptual estimating large mechanical systems from very basic narratives / architectural plans. This is a key skill that will be developed working closely with an assigned preconstruction manager.
  • Support all tasks given to you by preconstruction managers, including:
  • Quantitative take-off
  • Narrative writing
  • RFP support and integration with marketing group
  • Department betterment goal support
  • Transition support between preconstruction and construction
  • Fully support management of scope and budget on assigned projects before the project begins construction phase.
  • During design and estimating phase for project; supports design phase management.
  • supports budget management, supports managing risk and opportunities for budget.
  • Review contracts, drawings, specifications, and other resources to answer questions.
  • Coordinate equipment procurement with purchasing department and outside vendors to order and expedite material.
  • Assist in development of Scope of Work for subcontractors.
  • Coordinate job set-up, site mobilization, project administration and closeout.
  • Support the scheduling and coordination of trades.
  • Coordinate the McKinstry scope of work with the project drawings and specifications.
  • Assist in preparation of Job Start and Project Closeout documentation and meeting materials.
  • Assist in preparation of monthly financial reporting.
  • Communicate with Architect, Engineer and Owner, to assist the Project Manager with daily duties or act as Preconstruction Manager.
  • Coordinate field activities of self-performed and subcontracted work as necessary.

Communication

  • Takes initiative to facilitate own development process in conceptual estimating and overall preconstruction management. Must seek continual feedback and mentorship to develop the knowledgebase for advancing conceptual estimating skillset and preconstruction management skillset.
  • Respond to questions raised by Superintendents, review contracts, drawings, specifications and other resources to answer questions in a timely manner.
  • Consult with project management team if necessary to resolve issues.
  • Communicate with Subcontractors, Architect, Engineer and Owner, to assist the project management team with daily duties.

Documentation

  • Create and respond to Requests for Information (RFI) in the preconstruction process.
  • Develop, process and track equipment, material and informational submittals.
  • Create site-specific work plans during the precon phase in order to communicate the project plans for the field when operations takes over.
  • Create and publish Operations and Maintenance Manuals for client.
  • Obtain detailed knowledge of contract, drawings, and specification for project(s).
  • Assist in the client and subcontractor change order process.
  • Create billing breakdowns and prepare billing substantiation, as needed.
  • Update and manage all project files.
  • Conduct quantity take off and pricing estimates for internal and external uses.

Safety

  • Uphold and communicate McKinstry safety standards.
  • Coordinate with Safety team to create and communicate site safety plan.
  • Ensure safety compliance of subcontractors and all on-site personnel.

What You Need to Succeed at McKinstry

  • Must have demonstrated proficiency for all the responsibilities of a Construction Project Coordinator or Associate Estimator.
  • Knowledge of construction concepts required.
  • Ability to read and interpret construction plans, specs, contracts, proposals, estimates, and other regularly encountered items required.
  • BA/BS degree in Construction Management, Mechanical Engineering, Electrical Engineering, Architecture, Facilities Management or comparable degree—or equivalent work experience required.
  • Intermediate knowledge of Microsoft Word, Excel, Outlook and Project required; working knowledge of SharePoint preferred.
  • Customer service and or office administration experience preferred.

PeopleFirst Benefits

When it comes to the basics, we have you covered:

  • Competitive pay
  • 401(k) with employer match and profit-sharing plan
  • Paid time off and holidays
  • Comprehensive medical, prescription, dental, and vision with low or zero deductible options and low out of pocket maximums

People come first at McKinstry, and we go beyond the basic benefits with:

  • Family formation benefits, including adoption and IVF assistance
  • Up to 16 weeks paid parental leave
  • Transgender inclusive benefits
  • Commuter benefits
  • Pet insurance
  • “Building Good” paid community service time
  • Learning and advancement opportunities via McKinstry University
  • McKinstry Moves onsite gyms or reimbursement for remote workers

See benefit plan documents for complete details.

If you’re driven by our vision to build a thriving planet together, McKinstry is the place to build your career.

The pay range for this position is $29.55 - $44.00 per hour; however, base pay offered may vary depending on job-related knowledge, skills, and experience. Base pay information is based on market location. This role is considered non-exempt and will be paid hourly. A bonus may be provided as part of the compensation package, in addition to a full range of medical, financial, and/or other benefits, dependent on the position offered.

The McKinstry group of companies are equal opportunity employers. We are committed to providing equal employment opportunities to all employees and qualified applicants without regard to sex, gender identity, sexual orientation, age, race, color, creed, marital status, national origin, disability, veteran status, genetic information or any other basis protected by law. This policy applies to all terms and conditions of employment including, but not limited to employment, advancement, assignment, and training. This commitment to Equal Employment Opportunity is made equally as a social responsibility and as an economic and business necessity.

McKinstry is a drug-free workplace. Employment is contingent upon successfully passing a pre-employment drug and alcohol test, complying with the requirements of the Immigration Reform and Control Act and a Confidentiality Agreement, in addition to successful outcomes of background and reference checks.

Applicants for this role will only be considered if they possess current US Work Authorization, and do not require employer-sponsored VISA support to begin or remain in this role.

#LI-TG1

McKinstry

About McKinstry

We're a national construction and energy services company dedicated to innovating the waste and climate harm out of the built environment. Through 65 years of collaborative partnerships and an outcomes-driven focus, we're removing barriers in the way of achieving decarbonization. Constantly innovating, we work to engineer and design buildings and buildings systems that do not harm the environment.

We're building the future, and we’d love to have you join us.

Industry
Construction & Skilled Trades
Company Size
1,001-5,000 employees
Headquarters
Seattle, WA
Year Founded
1960
Social Media