Key
Metric
Develop detailed Pre-Commissioning execution plan including system/sub-system breakdown, marked-up P&IDs, and checklists
Approved Pre-Commissioning Execution Plan prior to field execution
Establish pre-commissioning logic, sequencing, and resource-loaded schedule aligned with master shutdown plan
100% alignment with master shutdown schedule; no delay from pre-commissioning activities
Ensure strict implementation of safety culture including JSA, LOTO, and PTW protocols
Zero LTI and full compliance with safety procedures
Identify and estimate required temporary equipment, materials, and consumables
Accurate material planning with no major shortage during execution
Lead execution of mechanical and piping pre-commissioning (water jetting, air blowing, chemical cleaning, oil flushing, flange management, leak testing)
Activities completed as per quality standard and schedule
Oversee reinstatement of piping systems and equipment internals after cleaning
100% systems reinstated without defects or rework
Manage chemical cleaning, nitrogen purging, and bolt torquing activities
All activities executed in accordance with approved procedures and specifications
Interface with Construction, QA/QC, Operations, and Commissioning teams for system handover
Smooth Mechanical Completion (MC) handover with minimal punch list
Review and approve SOPs and check sheets for testing and preservation
All procedures approved prior to execution and compliant with standards
Maintain and actively implement SHE programs and responsibility (involve identify, mitigate and monitor SHE risk), including SHE Management System to ensure the effectiveness of the programs conform to official standard, requirements and procedure applied and to confirm the execution of the SHE Responsibility meet the intended outcome
- SHE risks well maintained
- Target Zero LTI
- SHE Management System meets the current ISO 14001, ISO 45001, SMK3 & SMKP standards and requirements