Tatu City

Power Engineer

Tatu City  •  Songi, KE (Onsite)  •  42 minutes ago
Apply
AI can make mistakes so check important info. Chat history is never stored.

Job Description

Tatu City is hiring a Power Engineer who will be tasked with preparing engineering designs, specifications, and bills of quantities for power system projects, while overseeing construction, installation, testing, commissioning, and maintenance of electrical networks. The role also includes managing distribution and transmission infrastructure, renewable energy systems such as solar PV and storage, and ensuring compliance with electrical standards and safety regulations. The successful candidate will have at least eight years of experience in power utility infrastructure, with proven expertise in project management, stakeholder coordination, and technical team leadership.

Key responsibilities include:

  • Prepare engineering studies, specifications, designs, drawings, and bills of quantities for power system projects.
  • Supervise the construction, installation, testing, commissioning, and maintenance of low, medium, and high voltage power networks and associated equipment.
  • Operate and maintain overhead, underground, indoor, and outdoor electrical distribution and transmission infrastructure.
  • Design, implement, and manage renewable energy systems, including solar photovoltaic (PV) and energy storage solutions.
  • Prepare technical tender documents, evaluate bids, and support procurement activities for power-related projects and services.
  • Monitor power system performance and reliability, and implement measures to improve network safety, efficiency, and availability.
  • Ensure compliance with applicable electrical standards, regulatory requirements, and health, safety, and environmental policies.
  • Manage projects, contractors, and technical teams to ensure timely and cost-effective delivery of assigned works.
  • Minimum of eight (8) years of hands-on experience in the design, construction, testing, commissioning, operation, and maintenance of power utility infrastructure, including electricity generation, transmission, and distribution systems.
  • Bachelor's degree in Electrical Engineering or an equivalent qualification from a recognized institution.
  • Registered Professional Engineer or Graduate Engineer with the Engineers Board of Kenya and a member of the Institution of Engineers of Kenya.
  • Licensed Electrical Worker by the Energy and Petroleum Regulatory Authority, preferably Class B or higher.
  • Licensed Solar PV Technician by the Energy and Petroleum Regulatory Authority, preferably Class T3 will be an added advantage.
  • Demonstrated experience in the operation and maintenance of low, medium, and high voltage electrical systems and equipment.
  • Proven experience in design, implementation, testing, commissioning, and operation of solar photovoltaic (PV) and other renewable energy systems.
  • Experience in the preparation of technical tender documents, bid evaluations, and contract administration for engineering projects.
  • Demonstrated experience in managing engineering projects, including planning, budgeting, scheduling, risk management, and stakeholder coordination.
  • Proven ability to lead, supervise, mentor, and develop technical teams and contractors in a utility or engineering environment.
  • Good understanding of applicable utility regulations, engineering standards, health and safety requirements, and environmental compliance obligations.
  • Proficiency in power system studies and analysis, including load flow, short-circuit, protection coordination, and system modelling using software such as ETAP, DIgSILENT PowerFactory, CYME, or equivalent.
  • Proficiency in AutoCAD, PVsyst, and other engineering design, modelling, and simulation software.
Tatu City

About Tatu City

Tatu City, Kenya’s first operational Special Economic Zone (SEZ), is owned and developed by Rendeavour, the largest new city and industrial park builder in Africa.

Backed by American, Norwegian, New Zealand and British investors, Tatu City is one of the largest construction projects in East Africa and a regional hub for businesses, homes, education and recreation within a 5,000-acre infrastructure-ready SEZ.

Current development at Tatu City is valued at more than USD 1.2 billion, with industrial, residential, office and school developments open or under construction.

Tatu City is a secure, predictable and proven environment for individuals and businesses, and already home to investments by CDC, IFC, major local banks and local and international real estate developers and funders.

Tatu City is designated as a Project of Strategic National Importance pursuant to The Physical and Land Use Planning (Classification of Strategic and Inter-county Projects) Regulations, 2019. It is a flagship Vision 2030 private sector development and is gazetted as a Special Planning Area.

Industry
Real Estate & Property
Company Size
201-500 employees
Headquarters
Nairobi, KE
Year Founded
2008
Social Media