Production Control drives construction through work paper and material and works hand in hand with Operations to complete submarine construction. Multiple positions are available in support of CLB Production Control. The successful candidate will be required to perform Production Control functions which include, but are not limited to, Work Order management, software and hardware expediting in support of Work Order schedules, change processing, and work completion close-out. In order to perform these functions, the successful candidate will be required to interface with Operations, Engineering, Design, Material Systems, Configuration Management, Quality and other support organizations at various levels of management.
This position requires a self-motivated person with attention to detail and the desire to work in a fast paced high volume atmosphere. Candidate will be responsible for the successful scheduling, manufacturing, construction and delivery of complex components within a scheduled time frame. The ability to adjust priorities daily is a necessary trait. Successful candidate will be expected to be aware of and in compliance with those attributes of Safety, Quality, Cost, Schedule and Process Improvement as they apply to their position.
This is an onsite position Monday - Friday with openings for both 1st 6am-2:30pm & 2nd shift 3pm-11:30pm.
Required:
Preferred:
Climbing, Crawling, Kneeling, Light Lifting, Reaching, Stooping, Twisting
Cold, Dry, Dusty, Fumes, Hot, Inside, Noise, Oily, Outside, Wet

General Dynamics Electric Boat is a business unit of General Dynamics with headquarters in Groton, CT. The world’s first and finest submarine builder, Electric Boat was established in 1899 to complete the U.S. Navy’s first modern commissioned submarine, USS Holland. Designed and built by Electric Boat, USS Nautilus, the world’s first nuclear-powered submarine, was launched in 1954. Electric Boat has designed and delivered 17 of the U.S. Navy’s 20 classes of nuclear submarines. Now in its second centennial of submarine building, EB is the design yard and prime contractor for the Virginia-class submarine program, currently in production. EB is also designing and developing the Columbia-class ballistic-missile submarine which will replace the current Ohio class beginning in 2027.