
Operations supervisor position for the Facilities trade organization.
This position is for the D501 piping trade supervision which consists of Maintenance Pipe Fitters. This will consist of developing and scheduling daily/weekly workloads using CMMS, completing work orders in a timely manner, maintaining safety (JHA) and training programs, conducting preventative maintenance program of facilities equipment and utilizing process improvement programs.
Applicant will also be required to work with outside contractors and support other Facilities and Operations organizations to complete job tasks.
Required:
Must meet one of the following:
Preferred:
Climbing, Color Vision, Crawling, Heavy Lifting, Kneeling, Light Lifting, Medium Lifting, Pulling, Pushing, Reaching, Stooping, Twisting
Acids or Alkalis, Cold, Dry, Dusty, Fumes, Hot, Inside, Noise, Oily, Outside, Wet

General Dynamics Electric Boat is a business unit of General Dynamics with headquarters in Groton, CT. The world’s first and finest submarine builder, Electric Boat was established in 1899 to complete the U.S. Navy’s first modern commissioned submarine, USS Holland. Designed and built by Electric Boat, USS Nautilus, the world’s first nuclear-powered submarine, was launched in 1954. Electric Boat has designed and delivered 17 of the U.S. Navy’s 20 classes of nuclear submarines. Now in its second centennial of submarine building, EB is the design yard and prime contractor for the Virginia-class submarine program, currently in production. EB is also designing and developing the Columbia-class ballistic-missile submarine which will replace the current Ohio class beginning in 2027.