
You’ve discovered something special. A company that cares. Cares about leading the way in construction, engineering, manufacturing and renewable energy. Cares about redefining how energy is designed, applied and consumed. Cares about thoughtfully growing to meet market demands. And ─ as “one of the Healthiest 100 Workplaces in America” ─ is focused on the mind/body/soul of team members through our Culture of Care
The Mechanical Project Engineer (PE - Mech) supports execution of mechanical systems on hyperscale data center projects under the FTI / Excellerate delivery model. This role focuses on coordination, documentation, and technical support for complex cooling systems, prefabricated assemblies, and failure-domain-based infrastructure, ensuring safe, high-quality, and on-schedule project delivery.
MINIMUM REQUIREMENTS
Education: Bachelor’s degree in Mechanical Engineering, Construction Management, or related field (or equivalent experience).
Experience: 2 to 6+ years of construction or engineering experience, ideally with a focus on mechanical systems. Experience working on mission-critical or data center projects is preferred, along with a foundational understanding of HVAC and piping systems and familiarity with construction coordination processes.
Travel: 10-20%
Work Schedule: This position works between the hours of 6 am and 6 pm, Monday through Friday.
KEY RESPONSIBILITIES
Project Coordination & Execution Support
RFI, Submittals & Document Control
Mechanical Systems Coordination
Prefabrication & Material Management
Field Support & Quality Assurance
Schedule, Reporting & Communication
Safety & Compliance
Commissioning & Turnover Support
CORE COMPETENCIES
The job description and responsibilities described are intended to provide guidelines for job expectations and the employee's ability to perform the position described. It is not intended to be construed as an exhaustive list of all functions, responsibilities, skills, and abilities. Additional functions and requirements may be assigned by supervisors as deemed appropriate.
How Does FTI Give YOU the Chance to Thrive?
If you’re energized by new challenges, FTI provides you with many opportunities. Joining FTI opens doors to redefine what’s possible for your future.
Once you’re a team member, you’re supported and provided with the knowledge and resources to achieve your career goals with FTI. You’re officially in the driver’s seat of your career, and FTI’s career development and continued education programs give you opportunities to position yourself for success.
FTI is a “merit to the core” organization. We recognize and reward top performers, offering competitive, merit-based compensation, career path development and a flexible and robust benefits package.
Benefits are the Game-Changer
We provide industry-leading benefits as an investment in the lives of team members and their families. You’re invited to review the full list of FTI benefits available to regular/full-time team members. Start here. Grow here. Succeed here. If you’re ready to learn more about your career with FTI, apply today!
Faith Technologies, Inc. is an Equal Opportunity Employer – veterans/disabled.
Employment is contingent upon successfully passing a background and drug test

Faith Technologies Incorporated (FTI) is a dynamic organization comprised of construction, engineering, manufacturing and renewable energy experts. We create success for our partners and team members through innovation and expertise, rethinking how energy is designed, applied and consumed, and providing solutions that go beyond the ideas of today.
With our brands – EnTech Solutions™, Excellerate® and Faith Technologies® – we provide end-to-end solutions, from assessment and engineering to manufacturing, installation, operations and optimization. We also offer capital asset management solutions to support project development and financial needs.
- EnTech Solutions™: Provides distributed energy capabilities, eMobility charging, sustainable fuel technologies and asset management solutions for customers looking for reliable, clean energy solutions.
- Excellerate®: A national manufactured products brand with a focus on electrical assemblies and modular solutions, including EV charging infrastructure. Excellerate’s brands range from made-to-stock to custom-engineered energy and construction solutions, that increase cost savings, productivity and safety.
- Faith Technologies®: An energy expert and industry leader in electrical planning, engineering, design and installation; continually driving change through a dedicated investment in technology, strategic project consulting and engineering.
For more information, visit faithtechinc.com.