Job Description
Mechanical Lead (Erection, Testing & Commissioning) - Combined Cycle Power Plant (CCPP)
Experience: 18–20 Years
Plant Type: Combined Cycle Power Plant (~230 MW)
Location: Project Site
1. POSITION SUMMARY
The Mechanical Lead shall be responsible for complete execution, supervision, and management of erection, pre-commissioning, testing, and commissioning of all mechanical systems of a Combined Cycle Power Plant.
The role requires deep expertise in Gas Turbine, Steam Turbine, HRSG, Diverter Damper/Bypass Stack systems, rotating equipment, valves, and Balance of Plant (BOP), along with strong site leadership and cross-functional coordination.
The incumbent will also support overall site management in the absence of the Project Head, ensuring smooth execution and adherence to project timelines.
Owendo, being a relocation project site, the posting will be initially at the GVK site for a period of 6 months max, till completion of dismantling and transportation of Plant & later on the candidate has to relocate to the final location Gabon during construction of Plant , Installation, Erection & Commissioning.
However, the other two Projects, Port Gentil & Lambrane, being Simple cycle Plants, with bare minimum BOP equipment & less challenges during Erection & Commissioning phase, we will have the similar JD but with lesser experience , which I shall also share with HR.
2. KEY RESPONSIBILITIES
A. Erection & Installation
- Lead and supervise erection of:
- Ensure:
B. Rotating Equipment (Critical Scope)
- Erection, alignment, testing, and commissioning of:
- Exposure to:
- Compressors:
C. HRSG & Steam System
- Supervise erection and commissioning of:
- Valve systems:
D. Valve Installation & Testing
- Erection, inspection, and testing of:
- Safety valves:
- Conduct:
E. BOP Systems (Mechanical Scope)
Lead mechanical execution for:
- DM Water Systems
- Fire Water Systems (including fire pumps)
- Cooling Water System
- Compressed Air System
- Potable Water System
- HVAC systems
F. Pre-Commissioning Activities
- Flushing and cleaning:
- Hydro testing and leak checks
- Alignment verification and coupling checks
- Rotation checks and trial runs
G. Commissioning
- Lead commissioning of:
- Conduct:
H. Coordination & Interface Management
I. Vendor & Contractor Management
- Coordinate with OEMs:
- Supervise and control:
- Ensure:
J. Site Leadership Role
- Act as Site In-Charge in absence of Project Head
- Responsible for:
- Maintain:
K. Quality & Documentation
- Review and ensure:
- Ensure punch point identification and closure
L. Safety & Compliance
- Enforce:
- Ensure safe practices during:
- Compliance with:
3. REQUIRED SKILLS & COMPETENCIES
Technical Skills
- Strong expertise in:
- Knowledge of:
Functional Skills
- Ability to interpret:
- Strong troubleshooting capability
- Project execution and planning skills
Behavioral Skills
- Leadership and team management
- Strong decision-making capability
- Effective coordination across disciplines
- High ownership and accountability
4. QUALIFICATIONS
- Bachelor's Degree in Mechanical Engineering
- 18–20 years of experience in Combined Cycle / Thermal Power Plant projects
- Extensive experience in erection, testing & commissioning
5. DESIRED EXPERIENCE
- Hands-on experience in:
- Exposure to international standards (ASME / API / ISO) preferred
6. KEY PERFORMANCE INDICATORS (KPIs)
- Timely completion of erection & commissioning milestones
- First-time-right alignment & installation
- Zero major rework incidents
- Equipment reliability during trial runs
- Safety performance (zero LTIs)
7. REPORTING STRUCTURE
- Reports to: Project Head / Commissioning Manager
- Leads:
- Coordinates with:
8. WORK ENVIRONMENT
- Site-based role with need based extended working hours during Erection Peak & commissioning
- High-pressure execution environment with strict timelines
- Strong focus on safety and coordination