
The Master Scheduler is responsible for creating and maintaining a valid master schedule for material and capacities by effectively balancing supply and demand for product. A valid master schedule is aligned with the operating plan resulting from Sales and Operations Planning (S&OP) and is the basis for detailed manufacturing schedules, which are executable on the shop floor, level loaded, and optimize capacity utilization and inventory.

Howmet Aerospace Inc., headquartered in Pittsburgh, Pennsylvania, is a leading global provider of advanced engineered solutions for the aerospace and transportation industries. The Company’s primary businesses focus on jet engine components, aerospace fastening systems, and titanium structural parts necessary for mission-critical performance and efficiency in aerospace and defense applications, as well as forged wheels for commercial transportation. With nearly 1,150 granted and pending patents, the Company’s differentiated technologies enable lighter, more fuel-efficient aircraft to operate with a lower carbon footprint.