Sarawak Energy Berhad

Manager (Hydro Planning)

Sarawak Energy Berhad  •  Kampong Tengah, MY (Onsite)  •  1 hour ago
Apply
AI can make mistakes so check important info. Chat history is never stored.

Job Description

External Open Resourcing

Location: Malaysia (MY), Sarawak Energy (SEB), Kuching, Sarawak

Company: SEB Power Sdn. Bhd., Hydro (50034021), Hydropower Development & Dam Management (50034270), Hydro Planning (Local)

Number of Openings: 1

Job Category: Established

Closing Date: 28 November 2026

KEY ACCOUNTABILITIES

  • Plan and conduct pre-feasibility and feasibility studies on hydropower projects including field and site investigation works.
  • Provide overall leadership for the initiation phase of the project and ultimate delivery of DG FEL 1 package.
  • Establishing project, technical requirement, and communicating project objectives and business needs to all stakeholders under FEL 1 package.
  • Accountable for the optimization of site selection for dam site, technology selection, and various feasibility studies required to establish project scope.
  • Review and analyze feasibility studies including feasibility design, project technical and financial viability as well as environmental & social issues and concerns.
  • Identify and rank potential hydropower projects and prepare initial project implementation program.
  • Drive collaboration by establishing strong network with key business stakeholders (both internal and external) to ensure seamless delivery of projects.
  • Manage and work with project consultants on pre-feasibility and feasibility studies.
  • Coordinate and work with the hydropower investigation team, SI contractors, and subcontractors.
  • Ensure regulatory compliance together with Hydropower Sustainability Standard (HSS) and applicable sustainability development frameworks during feasibility study phase of hydropower projects.
  • Manage hydropower analysis team including staff and office administration.

THINKING ENVIRONMENT & CHALLENGES:

  • Establish project objectives, business case for the project, business needs, and perform Business Analysis (Levelized Cost of Electricity (LCOE), Net Present Value (NPV), and Financing Plan) exercise.
  • Perform project technical Feasibility studies including Planning and Development System Studies.
  • Define and manage Project Planning Resources (Planning, Finance, GSO, Wayleave, etc) & project Requirements (project scope, design basis & specs, project assumptions, O&M requirements)
  • Establish preliminary Project Execution Strategy, define High-level Cost Estimate, and schedule & identify key risks and mitigation actions.
  • Establish High-level Stakeholders Analysis and permitting plan (SPA, land acquisition, wayleave, compensation, etc).
  • Deliver DG1 package and DG1 submission for approval.
  • Articulate ideas, technical concepts, and strategies clearly.
  • Critical thinking and able to strategize plans to resolve challenges.

QUALIFICATION & WORK EXPERIENCE:

  • At least ten (10) years of relevant working experience.
  • All positions in this job class require applicants to possess a minimum Degree in Civil Engineering or in relevant fields.
  • Strong knowledge in Sarawak Energy Project Model (SEPM), Hydropower Sustainability Standard (HSS), and hydropower development process.
  • Relevant working experience in hydropower development studies and hydropower projects.
  • In-depth knowledge in the multidisciplinary requirements of hydropower projects and other major power projects in design criteria, functional parameters, power and energy output, cost estimates, economic and financial analyses, and relevant regulatory requirements.
  • Being a registered Professional Engineer or Project Management Professional or recognized international / national professional body is an advantage.

Preference will be given to internal candidate.

Sarawak Energy Berhad

About Sarawak Energy Berhad

Sarawak Energy Berhad is a fully integrated electric utility responsible for the generation,transmission and distribution of electricity in the state of Sarawak. Sarawak,being the largest state in Malaysia,has over 20,000MW of identified hydro potential, ensuring plentiful and reliable energy for the future at very competitive prices. With solid financial credentials,Sarawak Energy looks set to fulfill the State's ambition to attract energy industries to Sarawak.

Sarawak Energy is now being transformed into a major energy and utility player in Sarawak as well as in the region via the consolidation of the State power generation, transmission, the power and energy provider, spearheading the thrust as the State's flagship energy and utility group,hence complementing the rapid development growth of Sarawak.

In line with the State Government's plans to make Sarawak Energy Berhad a catalyst of growth, the utility is proceeding with the development of large hydropower projects to deliver bulk energy reliably at relatively low costs. Besides the federal funded 2,400MW Bakun hydroelectric project which is due to commence generation in 2011, the construction of the 944MW hydro-power plant in Murum is already underway. Plans are in the offing to develop eight other power (7 hydro and 1 coal) plants in the near future.

The company is expected to invest 5-8 billion USD until 2020 to achieve this.

Industry
Energy & Utilities
Company Size
1,001-5,000 employees
Headquarters
Kuching, MY
Year Founded
1967
Social Media