Adani Group

Lead Transmission

Adani Group  •  Ahmedabad, IN (Onsite)  •  2 hours ago
Apply
AI can make mistakes so check important info. Chat history is never stored.

Job Description

The incumbent will be responsible for end-to-end planning, execution, and management of transmission line projects for Adani Green Energy’s renewable portfolio. The role is critical to ensuring timely evacuation, grid connectivity, regulatory compliance, and operational reliability of transmission infrastructure associated with large-scale solar and wind projects.

Responsibilities

  • Lead planning, design, execution, and commissioning of EHV/HV transmission lines (33kV and above) associated with renewable energy projects.
  • Coordinate end to end project lifecycle of Pooling Sub-station
  • Coordinate end to end project life cycle of Transmission Line - route survey, tower spotting, foundation works, erection, stringing, sagging, and commissioning activities.
  • Responsible for availability of materials at site as per the delivery schedule
  • Coordinate with state utilities (DISCOMs, STU), CTU, and regulatory bodies for grid connectivity, approvals, and charging.
  • Ensure compliance with CEA, IS standards, safety norms, and statutory regulations throughout project execution.
  • Oversee ROW management, land coordination, local authority liaison, and contractor interfaces to mitigate execution risks.
  • Monitor project schedules, cost controls, BOQs, DPRs, and ensure adherence to approved budgets and timelines.
  • Lead contractor and vendor management, including technical evaluation, billing certification, and performance monitoring.
  • Support PTL/DTL testing, energization, protection coordination, and integration with substations/switchyards.
  • Identify and mitigate technical, safety, and execution risks proactively.
  • Prepare and review technical documentation, progress reports, MIS, and presentations for internal and external stakeholders.
  • Provide technical guidance and mentorship to junior engineers and site teams.

Qualifications

  • B.E. / B.Tech – Electrical Engineering
  • 12–15 years of relevant experience in PSS and transmission line projects, preferably in renewable energy / power infrastructure.
  • Experience in handling utility-scale solar or wind evacuation projects.
  • Strong communication, coordination, and leadership capabilities.
  • Willingness to travel to project sites as required.
Adani Group

About Adani Group

Adani Group is a diversified organisation in India comprising 10 publicly traded companies. It has created a world class transport and utility infrastructure portfolio that has a pan-India presence. Adani Group is headquartered in Ahmedabad, in the state of Gujarat, India. Over the years, Adani Group has positioned itself to be the market leader in its transport logistics and energy utility portfolio businesses focusing on large scale infrastructure development in India with O & M practices benchmarked to global standards. With four IG rated businesses, it is the only Infrastructure Investment Grade issuer in India.

Adani owes its success and leadership position to its core philosophy of ‘Nation Building’ driven by ‘Growth with Goodness’ - a guiding principle for sustainable growth. Adani is committed to increase its ESG footprint by realigning its businesses with emphasis on climate protection and increasing community outreach through its CSR programme based on the principles of sustainability, diversity and shared values.

Watch Pehle Pankha Ayega | Phir Bijli Aayegi : https://www.youtube.com/watch?v=1orXXuPzNmY

Industry
Energy & Utilities
Company Size
10,000+ employees
Headquarters
, IN
Year Founded
1988
Website
adani.com
Social Media