
Particle Measuring Systems (PMS) is replacing its IFS ERP with Infor LN, delivered with Infor. Interface build and testing are under way from October 2026, with go-live targeted for July 2027.
The program includes integrations between Infor LN and the following third-party systems: Salesforce (sales and service, bidirectional), NoMuda (MES, on-premises), Modula (automated warehouse, on-premises), a trade compliance platform, a tax engine, e-invoicing and bank payment files, Workday, ADP, UPS, FedEx, PayPal Braintree and a software license service. Infor builds and tests the LN side. PMS owns the other side: third-party configuration or build, test environments, connectivity, credentials and end-to-end testing. The Business Systems team designs, prepares and builds, with one engineer close to full time on integration; build and test need a second.
You are one of two hands-on integration engineers on the PMS side, from validating Infor’s technical specifications, through build, connectivity, testing and go-live support. You own the non-LN build and configuration (API configuration and authentication, middleware and connector configuration, file interfaces, scripts and test automation), the test environments, the connectivity between LN and each third-party system, and the tests that prove each integration works. Salesforce is administered in-house; for the two on-premises systems the vendors' professional services may be engaged for their side, in which case you coordinate and test that work. The first priority is proven connectivity for the complex integrations in test environments, followed by unit testing of the standard ones.
This is a systems-integration role, not an application development role: the craft is making an ERP and its surrounding systems talk, and proving it, on a live implementation.
Required:
Strongly valued:
Comfortable on a small client-side team next to a much larger vendor team; documents as a habit; direct about what does not work. Drives technical issues with vendors and implementation partners to resolution without waiting to be asked.
Reports to the Technical Delivery Architect, who reports to the Transformation Director; until that role is in post, to the Business Systems Manager. Joins a small team of builders: an Enterprise Applications Engineer close to full time on integration and a Business Systems Analyst part of the time, both of whom design, prepare and build and continue to support IFS. Works daily with Infor's integration architect and functional consultants, PMS's Salesforce administrator, process owners, vendor professional services and PMS infrastructure.
October 2026 start, or as soon as possible thereafter; six months, with the expectation of extension through go-live (July 2027) and hypercare. Boulder, Colorado preferred; remote possible with core overlap on US Mountain time. Infor works across US and India time zones; some early or late calls. Full time.

Overview
Particle Measuring Systems sets the standard for contamination monitoring. With more than 60 patents, we create the technology that enables you to make fact-based decisions, improve process yield and comply with changing regulatory requirements. We understand the challenges our customers face. That’s why we keep up with your changing needs by actively participating in industry, trade and technology groups. With more than 500 employees, over 35 distributors, and local sales and services in more than 70 countries, we’re local everywhere.
Our Values
Be true: We believe in absolute integrity. It’s how we win for stakeholders, the environment and each other. We show care and respect for each other
Own it: We believe in teamwork and keeping our promises. It’s how we build our brands and businesses.
Aim high: We believe in being bold and positive. It’s how we perform at our best and achieve greater success.
Mission Statement
To be the differentiated leader for contamination monitoring by improving the performance of clean manufacturers through the application of superior technology, quality and service.
Sustainability and Corporate Responsibility
We have set a clear ambition:
Our operations:
Net Zero by 2030 (Scope 1 and 2 emissions)
Our value chain: Net Zero by 2040 (Scope 3 emissions)
Our science-based targets support this ambition:
The 85% absolute reduction in Scope 1 and 2 emissions by 2030
The 42% absolute reduction in Scope 3 emissions by 2030
Both targets have been set across the Spectris group and are aligned to a 1.5 degree warming scenario and have been validated by the Science Based Targets initiative.