The purpose of the Installation and Commissioning Engineer (ICE) role is to positively contribute to the project results through successful coordinated management and execution of multiple tasks in alignment with Installation and Commissioning (I&C) function objectives, priorities and methods.
The job holder operates with a high level of autonomy, and collaborates with peers and superiors to operationalize goals and priorities in line with the strategic direction for the project. He / she has day to day accountability for the successful delivery of the tasks for which he / she is owner, in order to achieve time, quality and cost targets, within financial, contractual and health and safety parameters.
Extensive travel within APAC with some travel to other regions (EMEA) for site Installation / commissioning work. Each project delivered by SPX Flow is led by a Project Manager supported by a project team.
The job holder may be assigned to specific projects, in this project team as: · Site Manager (SM)
· Installation Supervisor (IS)
· Commissioning Team Leader (CTL)
· Process Commissioning Engineer (PCE) Specific assignments depend on:
· The job holder skills set
· The size and complexity of the project The job holder is usually assigned when site operations start, if taking a role of IS or SM. He / she is assigned when installation is completed if taking a role of CTL or PCE. The following chart describes a typical project team organization, the possible positions (green boxes) of an I&C engineer, his / her role (red text) and the related reporting lines (green lines).
The job holder complies with SPX Flow project execution processes, methods and tools. He / she is accountable for achieving operational effectiveness within agreed time frame. In his / her role, he / she demonstrates a culture of innovation, high performance, accountability and continuous improvement, aligning efforts in the short and long term to the PM’s strategic goals.
· Installation Qualification (I/Q)
· Operational Qualification support (O/Q)
· Documentation management (including updating) for his / her areas
· Performance Qualification support (P/Q)
· Customer training
The Process Commissioning Engineer attends any meeting on the Commissioning Team Leader demand. He / she proceeds with weekly commissioning reviews and sends a weekly report to the Commissioning Team Leader. He / she is responsible for providing him / her with his / her final commissioning report before leaving site. The final commissioning report must include:
· IQ report
· Exhaustive records of instrumentation and frequency convertors settings
· Exhaustive records of results (flow, temperature, pressures, runtimes, …) obtained compared to the contractual or specified ones
The Process Commissioning Engineer is owner of the following process. Full completion of each of the tasks is his / her scope of supply. He / her can be supported by specialists but must ideally be able to handle each of these tasks without any external support. He / she must therefore demonstrate related knowledge and even skills. Mistakes and failures fixing are included. Formalization of the results is his / her deliverables.

SPX FLOW solves processing challenges, helping customers lower costs, increase uptime, save energy, reduce waste, and improve quality.
We manufacture and deliver high-value technology, service and support to leading nutrition, health, and industrial businesses around the world. From dairy processors and mixers to our state-of-the-art Innovation Centers, we collaborate with customers to develop and perfect their critical manufacturing processes. Our inventive pumps, values and systems make it easy to provide end-users with high quality products while cutting production costs. We support you, as you support them.
With operations in more than 25 countries, we meet the varying needs of our diverse customer base to make life safer, healthier and more sustainable. To learn more, please visit spxflow.com