
Follow the vibrations: from a high-frequency vibro hammer, through crane, pile and water into a crane vessel – and find out how to stop them.
Are you a final-year student with a passion for offshore engineering and looking for a graduation assignment that makes real impact? Join us and become part of a team that works on complex and large-scale offshore projects within one of our engineering disciplines. Kick-start your career with a graduation project in the heart of Structural Engineering. As a graduation student, you’ll dive into a challenging assignment that contributes directly to our operations, innovation efforts, or future developments. You'll be guided by experienced engineers and exposed to the practical world of offshore engineering, from concept development to project execution.
Heerema’s crane vessels install large foundation piles, using both impact hammers and high-frequency vibratory hammers (vibro). During vibro-driving the excitation does not stay in the pile: vibrations are transmitted into the crane boom and the vessel itself. We have measurement data on vessel vibrations during impact driving, a vibro-drivability model and initial modelling work on vessel vibrations, but we do not yet fully understand how the excitation travels – through the crane (vibro–crane–vessel), through the pile and the surrounding water (vibro–pile–water–vessel), or both – and which parts of the system start to vibrate and which do not. A sound understanding of these mechanisms is the basis for fundamental mitigation measures, which matter for the integrity of our equipment and structures and for safe and efficient installation operations.
You’ll work with real measurement data from Heerema’s crane vessels and existing engineering models, and learn to translate a complex, real-world dynamics problem into a model that is as simple as possible, but no simpler. You’ll deepen your knowledge of structural dynamics, data analysis in Python, and work closely with experienced engineers involved in offshore pile installation, giving you direct insight into how research feeds into offshore operations.
Is this you?
Start date: 1-2-2027
Duration: 9 months (approx. 3 months literature study, 6 months research and modelling)
Location: Leiden office
Ready to graduate with impact? Apply now and take the first step toward your offshore engineering career!
We are looking forward to hearing from you. We are interested in your CV, but we mainly want to find out more about your ambitions, your personality, and what is your motivation to succeed. So be sure to include a brief cover letter explaining why you are the perfect fit for this graduation assignment.
So hit the button, apply, and make the impossible possible with Heerema. We’d love to meet you!

Heerema Marine Contractors is a world-leading marine contractor in the international offshore energy industry.