We are seeking an experienced General Foreman to lead production operations in a modular
home manufacturing facility specializing in cold formed light gauge steel framing. This
hands-on leadership role oversees daily factory operations, quality control, and ensures
high-quality modular units are produced efficiently and safely, while driving continuous
improvement in a high-volume manufacturing environment. The ideal candidate has a
strong background in residential construction, modular/prefab construction, light gauge
steel systems, and supervising production crews.
related crews in the light gauge steel modular home factory.
quality, and delivery targets.
requirements, OSHA, and internal quality/safety protocols.
downtime; implement corrective actions as needed.
accountable for performance and safety.
to maintain smooth workflow and resolve bottlenecks.
modular construction.
strong safety culture.
practices, standard work, process improvements).
documentation; communicate status and issues to plant management.
needed
residential construction, with at least 2–3 years in a supervisory/foreman role.
or factory-based home production.
a manufacturing or construction setting.
schedules.
crews effectively.
walking, occasional lifting).
systems.
regulations.
execution systems.
This is an on-site factory role involving extended periods of standing and walking on the
production area, exposure to noise, dust, and industrial equipment, and occasional lifting.
Typical schedule is daytime with possible overtime during peak production periods.
Construction / factory setting with standard manufacturing and construction site conditions.
Medical, dental, vision, retirement plan (pension), paid time off, employee discount, and
profit share.
We are an equal opportunity employer. All qualified applicants will receive consideration for
employment without regard to race, color, religion, sex, national origin, disability status,
protected veteran status, or any other characteristic protected by law

Blue View Builders mission is to make construction affordable by combining modular components, site-built construction, computer aided construction, and green initiatives. On average, we can reduce building costs by more than 15% and reduce the construction time by months.