Field Services Manager
Tri-County Electric Cooperative (TCEC)
POSITION PURPOSE
Responsible for leading and managing the Cooperative's Field Services department, including the planning, coordination, design, staking, inspection, maintenance support, and project management of overhead and underground electric distribution facilities. Oversees field services personnel, contractor resources, workload distribution, project execution, municipal and TXDOT improvement projects, right-of-way activities, system inspections, and member service-related engineering support. Ensures projects are completed safely, efficiently, accurately, and in compliance with Cooperative standards while supporting operational reliability, member satisfaction, and strategic objectives.
JOB DIMENSIONS
Internal Responsibility Partners with Operations, Engineering, GIS, Business Development, Work Order Technicians, Accounting, Member Services, and other Cooperative departments to coordinate distribution system projects, maintenance activities, line extensions, system improvements, and field service operations. Provides leadership, training, workload management, performance oversight, and resource planning for Field Services personnel while supporting organizational goals related to safety, reliability, efficiency, and member service.
External Responsibility Collaborates with members, developers, contractors, engineering consultants, municipalities, TXDOT representatives, government agencies, utility partners, and other external stakeholders regarding electric service projects, distribution system improvements, right-of-way requirements, easements, inspections, and construction activities. Represents the Cooperative professionally while protecting Cooperative interests and maintaining positive stakeholder relationships.
PRINCIPAL ACCOUNTABILITIES
MINIMUM REQUIREMENTS
Education and Experience Bachelor's degree in Engineering Technology, Construction Management, Utility Management, Business Administration, or a related field preferred. Equivalent combination of education and relevant experience may be considered. Minimum ten (10) years of progressively responsible experience in electric utility design, staking, engineering support, construction, operations, or related field preferred. Minimum five (5) years of supervisory or leadership experience preferred.
Operational / Functional Experience Experience managing utility distribution design, staking, construction support, inspections, right-of-way activities, project management, and field operations. Experience coordinating utility infrastructure projects, contractor resources, municipal projects, and regulatory compliance activities preferred.
Knowledge / Skills / Abilities Strong leadership, communication, organizational, analytical, and project management skills. Ability to interpret engineering drawings, system maps, staking sheets, construction standards, easement documents, and utility tariffs. Working knowledge of electric utility operations, GIS applications, AutoCAD, staking software, GPS technologies, Microsoft Office products, and applicable utility design standards. Ability to lead teams, manage multiple priorities, and effectively communicate with technical and non-technical stakeholders.
POSITION DETAILS
WHY JOIN TCEC
Tri-County Electric Cooperative is guided by ten Essential Attributes that define how we lead, collaborate, and serve with integrity, accountability, and trust. This role offers the opportunity to make a meaningful impact while supporting reliable electric service for the communities we serve.
This job description is intended to identify the essential functions of a position and should not be interpreted as all-inclusive. An employee may be required to perform other reasonably related business duties as assigned by the immediate supervisor and/or management as needed. TCEC reserves the right to revise or modify the job description as needed. This job description does not constitute a written or implied contract of employment.

Tri-County Electric Cooperative is a member-owned electric provider based in Aledo, Texas. Since 1939, Tri-County Electric Co-op has provided safe and reliable energy to our member-owners across North Texas. With 9,294 miles of energized line and over 120,00 active meters, we are one of the largest electric co-ops in Texas.
Electric cooperatives were created to serve rural areas that were too isolated for major power companies to service. Today, many co-ops find their service areas growing in population with increased residential, commercial and industrial consumers. Tri-County Electric Co-op certainly fits this description. Today, our service area covers 16 counties in North Texas. With offices in Aledo, Azle, Granbury, Keller, Munday and Seymour, Tri-County Electric Co-op is available to serve our members to the best of our ability.
We cherish our Tri-County Electric Co-op roots and hold the seven cooperative principles to heart.
- Voluntary and Open Membership
- Democratic Member Control
- Members' Economic Participation
- Autonomy and Independence
- Education, Training and Information
- Cooperation Among Cooperatives
- Concern for Community
At Tri-County Electric Co-op, we pride ourselves in providing reliable service to our members at every level of our organization, from kind member service representatives to responsive linemen during outages. It is our goal to equip our members with energy-saving tips, electrical safety and benefits of membership. Please visit our website for interactive tools and educational materials: tcectexas.com
We're Hiring! Click here to see our open positions: tcectexas.com/careers