Sundt Construction

Field Engineer (night shift) - Data Center Construction

Sundt Construction  •  Temple, TX (Onsite)  •  3 hours ago
Apply
AI can make mistakes so check important info. Chat history is never stored.

Job Description

Field Engineer (night shift) - Data Center Construction

Job Summary

Assists the Project Engineer with being the technical source of information for the project. Responds to questions about drawings, specifications, shop drawings, and change orders and have responsibility for assisting in writing change orders, RFl's, meeting minutes, and reviewing Submittals. Maintains an effective and professional working relationship with owners, architects, engineers, subcontractors, and suppliers. This position includes three 'steps' (I, II and Senior), which provide for a progression of skill and experience. Step I is the entry level for individuals with a minimum of experience in this position.

Key Responsibilities

  1. Assists Project Engineer in developing and maintaining as-built drawings and other work tasks and assists with or reviews and processes submittals, change orders, RFl's, and budget forecasting. Ensures the timely and appropriate generation, collection, distribution, storage, retrieval and ultimate disposition of meeting agendas, RFl's and daily reports.
  2. Demonstrates an understanding of the project management plan (PMP) and is involved in support and execution of the plan. Demonstrates a thorough understanding of the change management process and performs project scope activities and supports the project team to ensure the work needed to complete the project successfully.
  3. Ensures the administration of the project quality management plan and demonstrates and reinforces a culture of safety throughout the project.
  4. May assist in the calculation of daily production rates and unit costs for self-performed work. Participates in risk management including identification, analysis, response planning and monitoring and control on a project and demonstrates competency in understanding the environmental control processes for the project and takes corrective actions when necessary.
  5. May be responsible for overseeing/managing the BIM (Building Information Modeling) Coordination between Subcontractors and Designers.
  6. May be responsible for the documentation and submittal for the LEED (Leadership in Energy and Environmental Design) Certification of a building and for creating and updating Digital Record Drawings (ORD).
  7. May provide lines, grades and layout as required for the project while maintaining an organized logbook.
  8. May provide the following weekly quantities: maintains accurate quantity logs and reports quantities in compliance with the cost control manual. Completed logs are to be filed with the project files. Perform elements of the processes involved in budgeting and controlling costs so that the project can be completed within the approved budget. Demonstrates business acumen within area of responsibility. (Not all Field Engineers track quantities)
  9. Provides support to superintendents required for the execution of the work and assists in the resolution of field problems as necessary.

Minimum Job Requirements

  1. Ability to assume responsibility, interface and communicate with others is essential.
  2. Entry-level position that normally requires a four-year construction-related degree or equivalent technical/field experience.
  3. Microsoft Office Suite (Outlook, Word, Excel, PowerPoint, etc.) proficiency.

Note: Job Description is subject to change at any time and may include other duties as assigned.

Physical Requirements

  1. Ability to wear personal protective equipment is required (including but not limited to; steel toed shoes, gloves, safety glasses, hearing protection, hardhat, vest, etc.)
  2. May reach above shoulder heights and below the waist on a frequent basis
  3. May stoop, kneel, or bend, on an occasional basis
  4. May use telephone, computer system, email, or other electronic devices on a limited basis to communicate with internal and external customers or vendors
  5. Must be able to comply with all safety standards and procedures
  6. Occasionally will climb stairs, ladders, etc.
  7. Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis
  8. Will interact with people frequently during a shift/workday
  9. Will lift, push or pull objects on an occasional basis
  10. Will sit, stand or walk short distances for up to the entire duration of a shift/workday.

Safety Level

Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as operating a vehicle, operating equipment, operating machinery or power tools, repairing/maintaining the operation of any vehicle/equipment, the handling/disposal/transport of hazardous materials, or the handling/treatment/disposal of potentially flammable/combustible materials.

#LI-HW1

About the Company

As a 100% employee-owned contractor, when you work at Sundt, you’re not just hiring on at a company, you’re joining a culture. Because everyone at Sundt is part owner, you’ll join a team of people who are deeply invested in their work. From apprentices to managers, we’re passionate about the details and deliberate in everything we do.

At Sundt we focus on building long-term prosperity for our clients, communities and employee-owners. We offer competitive pay, industry-leading benefits including a 401k and employee stock ownership plan, incentive programs for craft and administrative employees as well as training that focuses on your personal and professional growth. We’re driven by skill, grit and purpose. Join us as we strive to be the most skilled builder in America.

Equal Opportunity Employer Statement: Sundt is committed to the equal treatment of all employees, and/or applicants for employment, and prohibits discrimination based on race, religion, sex (including pregnancy), sexual orientation, gender identity, color, age, disability, national origin, covered veteran status, genetic information; or any other classification protected by applicable Federal, state, or local laws.

Benefit list:

  • Market Competitive Salary (paid weekly)
  • Bonus Eligibility based on company, group, and individual performance
  • Employee Stock Ownership Plan & 401K
  • Industry Leading Health Coverage Starting Your First Day
  • Flexible Time Off (FTO)
  • Medical, Health Savings, and Wellness credits
  • Flexible Spending Accounts
  • Employee Assistance Program
  • Workplace Wellness Programs
  • Mental Health Program
  • Life and Disability Insurance
  • Employee-Owner Perks
  • Educational Assistance
  • Sundt Foundation - Charitable Employee-Owner's program

NOTICE TO EXTERNAL SEARCH FIRMS Sundt Construction's Talent Acquisition team is the only authorized department to engage with and execute agreements on behalf of the company with external search firms, staffing agencies, and other third-party recruiting partners. Sundt Construction does not accept unsolicited candidate submissions. We will only consider candidates submitted by agencies that have a fully executed agreement with Sundt Construction on file prior to the candidate's submission.

Any candidate submitted without an active, fully executed agreement will not be considered a qualified referral, and Sundt Construction assumes no obligation to pay any placement or recruiting fees. Additionally, any unsolicited resumes submitted to any Sundt Construction employee—including hiring managers or other personnel—will be deemed the property of Sundt Construction without any obligation to the submitting agency.

Sundt Construction

About Sundt Construction

Sundt Construction, Inc. is one of the country’s most respected general contractors, currently ranked in the top 100 largest construction companies in the United States by ENR, the industry’s principal trade magazine. We're consistently ranked a Best Place to Work by our own employees and known nationally for our innovative approach to construction services. We've also won more Build America awards from the Associated General Contractors of America than any other general contractor.

Sundt is a full-service building contractor with expertise that spans the entire lifecycle of construction. We offer Construction Management at Risk, Design-Build and Build to Suit Contracting, and can work within your preferred delivery system, including the traditional Design-Bid-Build approach. We also provide a host of services as Construction Managers and Program Managers, serving as your agent for managing the entire project development process for you, whether you have a single- or multiple-project program.

Please check out our website (www.sundt.com) to browse our capabilities and review our career opportunities. We're an industry leader looking for the industry's best talent. Come find your next career opportunity with us!

Industry
Construction & Skilled Trades
Company Size
1,001-5,000 employees
Headquarters
Tempe, AZ
Year Founded
1890
Website
sundt.com
Social Media