
TransEd Valley Line LRT is the first piece of the Valley Line project in Edmonton. Connecting Mill Woods to downtown Edmonton, the Valley Line allows commuters to go from the Southeast of Edmonton to anywhere the LRT stops.
TransEd is made up of hard-working, respectful, and talented people who understand and invite diversity to the workplace. We take pride in holding ourselves accountable and continuing to meet or exceed service levels for the greater Edmonton community. We ensure they receive quality services because they—along with our people—are the reason we endure and succeed. And it sure feels good helping hard-working Edmontonians get from A to B in a seamless transit experience.
Thank you for your interest in TransEd Valley Line LRT. Only those candidates selected for interviews will be contacted.

Stage one of the Valley Line connects Mill Woods to downtown Edmonton with about 13.1 km of light rail transit (LRT). This stage includes 11 stops, an elevated station incorporating a transit centre and Park & Ride, and a transfer point to other LRT lines at Churchill Square.
The Valley Line Southeast is different from the high-floor LRT system on Edmonton's other lines. The Valley Line Southeast features new, low-floor, urban-styled trains that provide more pedestrian-friendly access with street level stops. In residential and commercial areas, embedded tracks are integrated with the established design and traffic flow of the area.
Pre-construction work began in March 2016 and stage one of the City of Edmonton’s Valley Line LRT became operational in November 2023.