Non-Metallic Materials Engineering (D343) Preservation and Coatings Group is cognizant of everything related to surface preparation and painting requirements for construction of nuclear submarines. This group develops the Non-Propulsion Paint Schedule drawing requirements, performs design review of corrosion-prone items, and works closely with the Non-Metallic Materials Engineering Lab on coating tests. Primary responsibilities include: construction support - providing Trades clarification of coatings requirements with deck plate evaluation as required; providing disposition to Engineering Reports and Vendor Information Requests; drawing development / coating selection and prodicing detailed paint application procedures; develop laboratory test plans for evaluation of new coating methods and materials; perform forensic analysis of coating failures.
Required:
Preferred:
Climbing, Color Vision, Crawling, Kneeling, Stooping
Cold, Dusty, Hot, Inside, Noise, Outside

General Dynamics Electric Boat is a business unit of General Dynamics with headquarters in Groton, CT. The world’s first and finest submarine builder, Electric Boat was established in 1899 to complete the U.S. Navy’s first modern commissioned submarine, USS Holland. Designed and built by Electric Boat, USS Nautilus, the world’s first nuclear-powered submarine, was launched in 1954. Electric Boat has designed and delivered 17 of the U.S. Navy’s 20 classes of nuclear submarines. Now in its second centennial of submarine building, EB is the design yard and prime contractor for the Virginia-class submarine program, currently in production. EB is also designing and developing the Columbia-class ballistic-missile submarine which will replace the current Ohio class beginning in 2027.