
The Jerritt Canyon deposit was discovered in 1972, and the first gold production from the property occurred in 1981. The Jerritt Canyon property contains 30,821 hectares of mining claims located in the mining-friendly state of Nevada. First Majestic acquired the Jerritt Canyon Gold Mine from Sprott Mining Inc. on April 30, 2021. In May 2023, operations were suspended to prioritize exploration and technical studies. Jerritt Canyon is now entering a new phase of evaluation and planning, requiring substantial technical support to advance the work necessary for a potential future restart of operations.
The Electrical & Instrumentation Technician plays a key role in supporting the reliability and performance of site electrical and control systems at Jerritt Canyon. This position is responsible for executing maintenance, troubleshooting, and installation activities while ensuring compliance with safety standards and operational requirements.
Working closely with Maintenance and Operations teams, this role supports both preventative and corrective maintenance activities to ensure safe, efficient, and continuous operation of site equipment and systems.
The above duties and responsibilities are representative of the nature and level of work assigned and are not necessarily all-inclusive.
The Company is an equal employment opportunity employer committed to providing employment opportunities to employees and applicants in accordance with all applicable laws.

First Majestic is a publicly traded mining company focused on silver and gold production in Mexico and the United States. The Company presently owns and operates four producing underground mines in Mexico: the Los Gatos Silver Mine (the Company holds a 70% interest in the Los Gatos Joint Venture that owns and operates the mine), the Santa Elena Silver/Gold Mine, the San Dimas Silver/Gold Mine, and the La Encantada Silver Mine, as well as a portfolio of development and exploration assets, including the Jerritt Canyon Gold project located in northeastern Nevada, U.S.A.