Reporting to the Senior Drill & Blast Coordinator, the Drill & Blast Field Technician is responsible for ensuring alignment between the engineering and operations drill & blast teams by performing quality control on drilling, explosives loading, and blasting in the open-pit as well as preparing explosives loading instructions, collecting and archiving data, and resolving issues that arise during the execution of drill patterns.
This position is based in Geraldton, Ontario, operating on a 14:14 rotational schedule with 12-hour shifts, with the possibility of a fly-in/fly-out arrangement.

TSX: OLA NYSE: ORLA
Orla’s corporate strategy is to acquire, develop, and operate mineral properties where the Company’s expertise can substantially increase stakeholder value. The Company has three material projects, consisting of two operating mines and one development project, all 100% owned by the Company: (1) Camino Rojo, in Zacatecas State, Mexico, an operating gold and silver open-pit and heap leach mine. The property covers over 139,000 hectares which contains a large oxide and sulphide mineral resource, (2) Musselwhite Mine, in Northwestern Ontario, Canada, an underground gold mine that has been in operation for over 25 years and produced close to 6 million ounces of gold, with a long history of resource growth and conversion, and (3) South Railroad, in Nevada, United States, a feasibility-stage, open pit, heap leach gold project located on the Carlin trend in Nevada. The technical reports for the Company’s material projects are available on Orla’s website at www.orlamining.com, and on SEDAR+ and EDGAR under the Company’s profile at www.sedarplus.ca and www.sec.gov, respectively.