Cerebras Systems builds the world's largest AI chip, 56 times larger than GPUs. Our novel wafer-scale architecture provides the AI compute power of dozens of GPUs on a single chip, with the programming simplicity of a single device. This approach allows Cerebras to deliver industry-leading training and inference speeds and empowers machine learning users to effortlessly run large-scale ML applications, without the hassle of managing hundreds of GPUs or TPUs.
Cerebras' current customers include top model labs, global enterprises, and cutting-edge AI-native startups. OpenAI recently announced a multi-year partnership with Cerebras, to deploy 750 megawatts of scale, transforming key workloads with ultra high-speed inference.
Thanks to the groundbreaking wafer-scale architecture, Cerebras Inference offers the fastest Generative AI inference solution in the world, over 10 times faster than GPU-based hyperscale cloud inference services. This order of magnitude increase in speed is transforming the user experience of AI applications, unlocking real-time iteration and increasing intelligence via additional agentic computation.
We are seeking an experienced Data Center Construction Project Manager to lead and oversee the planning, design, and construction of mission-critical data center facilities. This role requires a dynamic leader who can manage complex, multi-phase construction projects from conception through commissioning while ensuring delivery on time, within budget, and to the highest quality standards, meeting sophisticated requirements of Cerebras AI cluster.
The Data Center Construction Project Manager will serve as the primary point of contact for all construction activities, coordinating between internal stakeholders, architects, engineers, general contractor, contractors, and vendors. You will be responsible for managing all aspects of data center construction including site preparation, shell and core construction (as applicable), mechanical and electrical systems installation, and critical infrastructure deployment. This position demands exceptional technical knowledge of data center systems, strong leadership capabilities, and proven experience managing large-scale construction projects in fast-paced environments.
This position may be based at our Sunnyvale, CA corporate headquarters with significant travel required to project sites (up to 50-75% travel) or may be site-based depending on project needs and candidate location.
Remote work options may be considered for experienced candidates, though on-site presence during active construction is required.
People who are serious about software make their own hardware. At Cerebras we have built a breakthrough architecture that is unlocking new opportunities for the AI industry. With dozens of model releases and rapid growth, we’ve reached an inflection point in our business. Members of our team tell us there are five main reasons they joined Cerebras:
Read our blog: Five Reasons to Join Cerebras in 2026.
Cerebras Systems is committed to creating an equal and diverse environment and is proud to be an equal opportunity employer. We celebrate different backgrounds, perspectives, and skills. We believe inclusive teams build better products and companies. We try every day to build a work environment that empowers people to do their best work through continuous learning, growth and support of those around them.
This website or its third-party tools process personal data. For more details, click here to review our CCPA disclosure notice.

Cerebras Systems is the world's fastest AI inference. We are powering the future of generative AI. Follow us for model breakthroughs and real-time AI results.
We’re a team of pioneering computer architects, deep learning researchers, and engineers building a new class of AI supercomputers from the ground up.
Our flagship system, Cerebras CS-3, is powered by the Wafer Scale Engine 3—the world’s largest and fastest AI processor. CS-3s are effortlessly clustered to create the largest AI supercomputers on Earth, while abstracting away the complexity of traditional distributed computing.
From sub-second inference speeds to breakthrough training performance, Cerebras makes it easier to build and deploy state-of-the-art AI—from proprietary enterprise models to open-source projects downloaded millions of times.
Here’s what makes our platform different:
🔦 Sub-second reasoning – Instant intelligence and real-time responsiveness, even at massive scale
⚡ Blazing-fast inference – Up to 100x performance gains over traditional AI infrastructure
🧠 Agentic AI in action – Models that can plan, act, and adapt autonomously
🌍 Scalable infrastructure – Built to move from prototype to global deployment without friction
Cerebras solutions are available in the Cerebras Cloud or on-prem, serving leading enterprises, research labs, and government agencies worldwide.
👉 Learn more: www.cerebras.ai
Join us: https://cerebras.net/careers/