Pernix Group, Inc.

Data Center Construction -Project Manager

Pernix Group, Inc.  •  Onsite  •  4 months ago
Apply
AI can make mistakes so check important info. Chat history is never stored.

Job Description

Join the Pernix Team to support a massive data center construction initiative!

Pernix International is embarking on a international data center initiative, and we’re looking for strong leaders and skilled professionals to join our team.

Pernix International is seeking a seasoned Project Manager to oversee the design, build, and construction of a large-scale, high-performance data center. The Project Manager will be a U.S CITIZEN, manage all aspects of the project lifecycle, ensuring successful delivery of the data center facility, including site preparation, building construction, electrical and mechanical systems integration, and commissioning of critical infrastructure. The role requires 8+ years of experience in large-scale construction, specifically in data centers or similar high-security, high-demand environments. Cultural sensitivity is essential as the project will involve managing third-country nationals and diverse teams.

Key Responsibilities:

  • Project Leadership & Strategy:
    • Lead the entire data center construction process, from pre-construction planning and design coordination through to construction execution and final commissioning.
    • Collaborate with senior leadership, clients, architects, engineers, and vendors to ensure alignment on project goals, timelines, and budget.
    • Maintain comprehensive oversight of the construction schedule, ensuring timely project completion and adherence to critical deadlines.
    • Implement and monitor project plans, including resource allocation, procurement strategies, site preparation, construction execution, and final handover.
  • Design & Build Coordination:
    • Manage the development of detailed designs and blueprints for the data center, ensuring compliance with all regulatory requirements, including local zoning, environmental, and safety codes.
    • Oversee the construction of the physical building structure, ensuring it meets the specific needs of a high-performance data center, including the appropriate load-bearing capacity, cooling, electrical, and fire suppression systems.
    • Work closely with architects and engineers to ensure the data center’s design includes appropriate redundancy, resilience, and scalability for current and future requirements (including mechanical and electrical systems like HVAC, fire suppression, and electrical distribution).
    • Supervise site selection, grading, excavation, foundation work, and structural steel erection, ensuring the facility is built to the highest standards.
  • Systems Integration & Infrastructure:
    • Coordinate the installation and integration of critical systems such as cooling units, generators, uninterruptible power supplies (UPS), fire suppression systems, access control systems, and security systems.
    • Ensure the electrical and mechanical systems are designed, installed, and commissioned in line with data center requirements (including Power Usage Effectiveness (PUE) goals, thermal efficiency, and redundancy).
    • Oversee the coordination of high-voltage electrical work, backup power generation, and HVAC system integration to ensure uninterrupted operations.
    • Ensure the building complies with industry standards, such as Tier III or Tier IV standards for uptime and reliability.
  • Third-Country Nationals & Workforce Management:
    • Manage and coordinate a diverse workforce, including third-country nationals, ensuring that cultural differences are respected, and local labor laws are adhered to.
    • Foster an inclusive and collaborative team environment that promotes high performance, safety, and quality.
    • Conduct regular site meetings to ensure that contractors, subcontractors, and vendors are aligned with the project’s expectations for quality and timelines.
    • Provide leadership to ensure compliance with environmental and social standards, including managing logistics and accommodations for third-country nationals, where applicable.
  • Risk Management & Compliance:
    • Identify and assess risks throughout the project lifecycle and implement risk management strategies, including budget overruns, scheduling delays, and environmental concerns.
    • Ensure that all project activities comply with health and safety regulations, environmental standards, and Pernix International’s safety protocols.
    • Ensure that the project adheres to all local and international regulatory standards, including seismic requirements, fire safety codes, and electrical safety codes.
  • Financial Management & Reporting:
    • Oversee project budgeting, including cost forecasting, financial reporting, and variance tracking.
    • Ensure all procurement activities are aligned with project timelines, budgets, and scope.
    • Review and approve subcontractor and vendor invoices, ensuring proper documentation and adherence to contract terms.
    • Regularly update senior management and clients on project status, potential risks, and cost-to-completion analysis.
  • Commissioning & Handover:
    • Oversee commissioning of the facility’s critical infrastructure, ensuring that all systems are tested, integrated, and fully operational before handover.
    • Ensure the data center is ready for occupancy, with all critical systems fully operational, tested for functionality, and in compliance with performance criteria.
    • Prepare and deliver all final project documentation, including as-built drawings, operation manuals, warranties, and final reports.
    • Coordinate a smooth handover to the operations team, ensuring all systems are documented and fully functioning as expected.


Qualifications:

  • Education & Experience:
    • Bachelor’s degree in Civil Engineering, Construction Management, Electrical Engineering, or a related field.
    • 8+ years of experience in construction project management, including significant experience managing data center builds or similar high-demand, critical infrastructure projects.
    • Proven track record in managing large-scale, complex construction projects with a focus on high-performance facilities, including power, cooling, and backup systems.
    • Extensive experience with third-country national workforce management and cultural sensitivity.
  • Technical Skills & Certifications:
    • In-depth understanding of building systems design and construction for data centers, including electrical systems, HVAC, fire protection, and structural considerations.
    • Familiarity with industry standards such as Tier I-IV, Uptime Institute, and ASHRAE.
    • Strong working knowledge of construction project management software (e.g., Procore, MS Project, Primavera) and Microsoft Office Suite.
    • PMP (Project Management Professional) certification preferred.
    • LEED accreditation or similar environmental certification is a plus.
  • Soft Skills & Competencies:
    • Exceptional leadership, communication, and team-building skills with a demonstrated ability to manage diverse, multi-disciplinary teams.
    • Strong organizational and multitasking abilities, with keen attention to detail.
    • Ability to work effectively under pressure and meet tight deadlines while maintaining quality and safety standards.
    • A proactive, problem-solving mindset, with the ability to identify challenges and implement innovative solutions.
    • High level of cultural sensitivity and experience working with diverse teams in international settings.

Why Pernix International?

Pernix International is at the forefront of delivering innovative and sustainable infrastructure solutions, and we pride ourselves on building projects that make a lasting impact. As a leader in the data center construction industry, we are looking for a driven Project Manager to join our team. This is an exciting opportunity to contribute to large-scale, cutting-edge projects in a dynamic and growing field.

Pernix Group, Inc.

About Pernix Group, Inc.

From power plants to consulates, military sites to commercial office buildings, clients trust Pernix Group to transform their most advanced, breakthrough concepts into reality.

We’re not your typical construction company. Whether sourcing one-of-a-kind sustainable construction materials, partnering with local craftspeople, or integrating innovative technologies, our agile team manages a large scale, international portfolio with unparalleled quality, customization, and collaboration.

Pernix operates around the world through a network of local subsidiaries and affiliated entities. Our focus on regional development is aligned with our international capabilities that allow us to further develop our business operations. The expansive network of our operations ensures that our global customers receive local support necessary to execute projects. Whether your project is small and simple, or large and complex, our team is capable of meeting all your construction and power needs. Our skilled project teams are adept at adjusting our capabilities and resources to fit the size of the project and provide added value through innovative solutions that produce improved results.

Learn more about our subsidiary companies by visiting their websites:

Pernix International www.pernixinternational.com

Industry
Construction & Skilled Trades
Company Size
201-500 employees
Headquarters
Lombard, IL
Year Founded
1995
Social Media