
NOTE: This is a limited duration contract position expected to last through all of 2026. Work may be performed remotely within the contiguous United States with travel as required for business needs.
The NuScale Enterprise Software Team provides expertise in the development and implementation of regulatory compliant plans and procedures to support engineering groups at NuScale. This position will be a limited engagement staff augmentation intended to perform a comprehensive update of the software plans, procedures and work instructions required for design and analysis engineering, code development, procurement, and document control under an NQA-1 quality framework. The work will involve updating all relevant procedures for simultaneous NQA-1 2008/2009a and 2022 compliance.
ESSENTIAL DUTIES AND RESPONSIBILITIES:
CORE COMPETENCIES: To perform the job successfully, the individual should demonstrate competencies in performing the essential functions of this position by performing satisfactorily in each of these competencies.
MINIMUM SKILLS, QUALIFICATIONS AND ABILITIES:
PHYSICAL DEMANDS The physical demands described here are representative of those that must be met by an employee to successfully perform the essential functions of this job. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions.

NuScale has designed a new kind of nuclear power plant that is smarter, safer, cleaner, and more cost competitive than the large gigawatt nuclear power plants of the past.
At the heart of the NuScale power plant is the NuScale Power Module™ (NPM), a small modular reactor (SMR) that brings together traditional components—the reactor vessel, steam generator, pressurizer, and containment—into a single, simplified, and fully factory-fabricated unit. Each NPM can produce 77 megawatts of electricity (MWe), and one NuScale plant can house up to 12 NPMs for a total of 924 MWe (gross). This scalability feature is unique to NuScale and allows for customization of facility output to match demand and project economics.
NuScale has achieved a paradigm shift in the level of safety of a nuclear power plant facility—safety comes first, second to none. NuScale’s Triple Crown for Nuclear Plant Safety™ design ensures that on loss of all electricity to the power station, an undesirable situation for other nuclear plant designs, each NPM will safely shut down and self-cool, indefinitely, with no need for operator or computer action, AC or DC power, or additional water. This capability is a first for commercial nuclear power.
Learn about NuScale’s work and our mission to improve the quality of life for all humankind by continuously improving nuclear power at www.nuscalepower.com