CONTRACTOR FOR CONSTRUCTION, INSTALLATION AND COMMISSIONING OF FOUR (4)FIXED-DOME BIOGAS DIGESTERS
Client: International Development Enterprises
Location: Chibombo (Kalola) and Masaiti (Kafulafuta) Districts), Zambia
Works: Four (4) 6 m³fixed-dome biodigesters
Procurement: Open call for technical and financial proposals
Contract: Fixed-price, supply-and-install works contract with milestone payments
Currency: Zambian Kwacha (ZMW)
Indicative Duration: Approximately 48 working days from agreed commencement, subject to approved programme and site readiness.
iDE Zambia seeks a qualified biogas construction contractor to supply all required materials and construct, install, test, commission and hand over four fixed-dome anaerobic digesters at approved beneficiary sites. The works comprise two digesters ( 6 m³ units) in each district: The contractor will train users in how to operate the bio-digesters and provide post-commissioning support.
The objective is to deliver durable, structurally stable, liquid-tight and gas-tight systems that safely produce and convey biogas and enable appropriate management of digestate (bio-slurry). Approved drawings, technical specifications and the priced Bill of Quantities (BOQ) shall form part of the contract.
The contractor shall procure, pay for, transport, unload, inspect, protect and securely store ALL materials, components, consumables and accessories required to complete the works in accordance with the approved BOQ and specifications. This includes masonry units, cement, sand, aggregates, reinforcement, waterproofing materials, formwork, gas pipes and fittings, valves, water traps, hoses, clamps, slurry structures and roofing materials where specified. The contractor shall also provide labour, supervision, plant, tools, testing equipment and personal protective equipment.
No material substitution or change to approved specifications is permitted without iDE’s prior written approval. The contractor shall verify quantities and include wastage, transport and handling in the fixed-price quotation; omissions or underestimation in the contractor’s pricing do not transfer procurement responsibility to iDE.
Provide practical user instruction at each site on feedstock preparation and loading, operating routines, gas use, condensate management, slurry handling, leak response, maintenance and fault reporting. Train designated iDE personnel through supervised demonstrations of setting out, masonry quality checks, gas installation, testing, commissioning and troubleshooting; record attendance and competencies. Provide a written workmanship/installation warranty stating duration, exclusions and response arrangements, plus at least three documented follow-up visits per digester during the agreed support period.
Chibombo: 2, 0, 2
Kafulafuta 2, 0, 2
The contractor has single-point responsibility for engineering verification, ALL material procurement and delivery, labour, tools and equipment, site supervision, safe construction, quality control, defect rectification, gas installation, testing, commissioning, training, records, warranty and after-sales visits. The contractor shall protect materials and completed works until acceptance and comply with applicable law and iDE safeguarding requirements.
iDE shall provide the approved design/BOQ and project coordination; identify and approve sites; facilitate beneficiary introductions and reasonable access; review submitted methods and reports; witness key inspections and commissioning; and certify satisfactory milestones for payment. iDE will NOT procure or supply construction materials under this assignment.
iDE shall issue written acceptance only after inspection confirms compliance with the approved specifications, safe operation and submission of required records. Acceptance does not waive contractual warranty obligations.
The indicative execution period is 48 working days, subject to an agreed start date and approved site-by-site schedule.. The bidders should rely on the two-district allocation above and the commencement date specified in the final contract.
The contractor shall submit concise weekly progress reports by site covering physical progress, procurement/delivery, inspections and test results, safety incidents, risks, variations requiring approval, training and next-week activities. Material changes to scope, price or programme require prior written authorisation.
The contractor shall implement a site-specific safety plan including PPE, excavation shoring/barricading, lifting and manual-handling controls, safe storage of cement and fuels, ventilation and ignition-source control during gas works, sanitation and waste management. Protect community members and children from worksites; child labour in hazardous construction is prohibited. Report incidents and safeguarding concerns promptly to iDE. Manage slurry and construction waste to avoid contamination of water, soil and public areas.
Submit a fully costed, fixed-price quotation in ZMW for the complete supply-and-install assignment, itemised by digester size and district and cross-referenced to the BOQ. The quotation MUST include all material procurement, delivery, handling, storage and wastage; skilled/unskilled labour; supervision; tools and equipment; excavation and construction; gas and slurry installations; testing and commissioning; training; travel and accommodation; warranty/follow-up; applicable taxes and other costs. State assumptions and any exclusions explicitly. Unpriced BOQ items shall be deemed included elsewhere in the tender price unless clarified in writing before award.
Mobilisation: Signed contract, approved inception package and verified mobilisation/procurement readiness
Construction progress: iDE-certified completion of agreed physical construction and installation stages
Practical completion: Successful inspection, required tests, training, signed handover and accepted final report
The final contract shall specify payment percentages, any retention and the warranty/defects-liability arrangements. Payments are conditional on certified milestones; advance payment, if any, is subject to iDE procurement rules and agreed safeguards.
Bidders shall submit: signed cover letter; company profile and registration/tax documents (where applicable); relevant qualifications and key personnel CVs; comparable assignment evidence and two references; technical methodology and schedule; site safety and quality plans; proposed warranty/after-sales arrangements; and a detailed priced BOQ and consolidated financial quotation.
Understanding and technical approach - 20%
Relevant fixed-dome construction experience - 25%
Personnel competence - 15%
Methodology, schedule and procurement capacity - 15%
Quality assurance, commissioning and safety - 10%
Warranty and after-sales - 5%
Financial offer/value for money - 10%
TOTAL - 100%
Only technically responsive submissions will proceed to financial consideration. iDE may seek clarifications, verify references and reject non-responsive proposals in accordance with its procurement procedures.
The contractor shall keep beneficiary, project and technical information confidential and shall not publish photographs or information without iDE’s prior written approval. Assignment-specific technical reports, records, checklists and training materials shall belong to iDE Zambia unless otherwise agreed in writing.
Procurement reference: ZM-TLTN-0005
Publication date: 17th November, 2026
Closing date and time: 27th November, 2026, 17:00hrs CAT
Submission address: All Application should be submitted via iDE Workable portal
Clarification contact: For any clarifications regarding the advertisement, please email: cndopu@ideglobal.org
Expected contract commencement: 18th January, 2027
The solicitation should be issued with the approved drawings, technical specifications and BOQ as annexes. These documents define final dimensions, materials, testing thresholds and construction details.

iDE is a global development organization that co-creates with foundations, governments, individuals, for-profits, and nonprofits to develop lasting solutions to poverty. We design and deliver market-based solutions in Agriculture and WASH in 11 countries across Asia, Africa, and Central America. Much more than a collection of technologies and field offices, we are a globally integrated ecosystem of nearly 1,000 staff, passionate about innovation and entrepreneurism.
The bottom line is improving the lives of our clients: the rural farmers and small businesses that are among the world’s poorest. The impact we report is rooted in reality and the data is readily available to anyone. This is our method of ensuring that the investments—in money and in time—made by our donors, the rural entrepreneurs we are working with, the customers they are serving, and our staff are having real impact.