Trevi S.p.A.

Concrete Foreman

Trevi S.p.A.  •  €26k - €31k/yr  •  Forlì, IT / Cesena, IT (Onsite)  •  29 minutes ago
Apply
AI can make mistakes so check important info. Chat history is never stored.

Job Description

Trevi SpA is hiring for construction sites in Italy:

Concrete Foreman

Requirements

  • Manage and coordinate all activities related to concrete pouring, including the preparation, positioning, and installation of reinforcement cages, as well as concrete curing, ensuring compliance with project specifications, safety requirements, and environmental regulations. Supervise and verify all reinforcement cage installation activities, including lifting, lowering, overlapping cage sections, positioning, and securing cages at the specified level in accordance with technical specifications and safety standards. Monitor and control all concrete pouring operations, including verification of excavation slurry quality and sand content, concrete compliance with technical specifications, tremie pipe length, and initial and final concrete levels during pouring. Manage and coordinate personnel involved in concrete pouring and related operations. Support the logistical coordination of materials, supplies, equipment, and site operations. Manage concrete unloading activities and ensure the correct execution of pouring operations. Prepare, maintain, and update concrete pouring reports and related documentation. Support the Manager in operational, organizational, and technical activities within the Function. Ensure compliance with and actively promote the Code of Ethics, company procedures, health and safety regulations, and applicable environmental legislation. Apply knowledge of the principles, techniques, and operating procedures relevant to Trevi works, the specific project, and the assigned role. Apply technical principles, methods, and execution procedures related to specialized foundation and concrete pouring activities. Perform and supervise maintenance, joint inspections, cleaning, positioning, and operational activities concerning platforms and tremie pipes. Manage and monitor all stages of desanding operations, ensuring proper execution and process efficiency. Monitor concrete rise during pouring and oversee the handling, adjustment, and extraction of tremie pipes. Verify the suitability of drilling slurry after desanding, applying relevant inspection methods, execution procedures, and corrective actions when necessary. Coordinate site logistics, including access routes, traffic management, and the stability and suitability of concrete unloading areas. Lead, coordinate, and supervise the dedicated operational team to ensure safe, efficient, and high-quality execution of works.

For this position, the expected gross annual salary ranges from 26.000€ to 31.000€, determined based on experience, skills, and the level of responsibility associated with the role, in compliance with the Edilizia Industria National Collective Labour Agreement. Meals and accommodation are provided in the event of assignments away from the usual place of work. Joining Trevi Group means becoming part of an international, innovative environment focused on people’s growth.

At Trevi Group, we believe in the value of people and in the richness of diversity. We welcome applications from talented individuals from different backgrounds, without distinction based on age, gender, sexual orientation, ethnicity, religion, or belief.

People are our starting point and our ultimate goal. In line with our commitment to equity and with the EU Pay Transparency Directive, we promote an inclusive and non-discriminatory recruitment process based on equal pay for work of equal value, without requesting candidates’ salary history.

Trevi S.p.A.

About Trevi S.p.A.

Trevi, a company specialized in special foundations

and soil consolidation, is part of the Trevi Group,

a world leader in subsoil engineering and in the

design and production of specialized machinery

and equipment in the sector.

Born in Cesena in 1957, in over 65 years of activity,

Trevi has developed a strong specialization in the

subsoil engineering sector, gaining a recognized

worldwide leadership in various fields of intervention.

Trevi, in fact, carries out special foundations and soil

consolidation works for large infrastructure projects

such as subways, dams, ports and docks, bridges and

viaducts, railway and highway lines, industrial and civil

buildings and special projects. It has also enhanced

a special technological expertise in environmental

protection interventions through which it secures

polluted sites.

Among the many projects carried out by the Group over

its 65 years of activity we remember: the construction

of the Ertan Dam, the consolidation of the

Tower of Pisa, the construction of the new Library

of Alexandria, the foundations of the Vasco

da Gama Bridge, the

foundation works of the new World Trade Center, the consolidation of the niches of the

Bamiyan Buddhas, the consolidation of

the Wolf Creek Damand of LPV-111 levee, the recovery of the Costa

Concordia, the new Copenhagen metro, the Four

Frankfurt business centre and the new

Paris metro line.

In 2016, the Group acquired the works for the safety

of the Mosul dam in Iraq, facing and overcoming an

extremely complicated technological and organizational

challenge and for which received the 2022 DFI

Outstanding project award.

In 2022, the Group acquired the works for the futuristic

The Line project in Saudi Arabia, the foundation and

consolidation works for the North East Link Project in

Melbourne and the construction

of the consolidation and drainage curtain of the Rogun

Main Dam Foundation in Tajikistan, one of the highest

dams in the world

Industry
Construction & Skilled Trades
Company Size
501-1,000 employees
Headquarters
Cesena, IT
Year Founded
1957
Social Media