Job Description
Please Read Before Applying
All Delta360 driver applicants must complete the official driver application through Tenstreet. Applications submitted outside of Tenstreet may not be reviewed.
Apply Here: https://intelliapp.driverapponline.com/c/deltafuel
Location: Hubbard, TX Schedule: 12-hour shifts, 6–7 days per week Type: Full-time, long-term project Compensation: Discussed during interview, plus per diem and housing provided
We’re looking for highly motivated CDL drivers to support a long-term data center construction project in Hubbard, TX. You’ll keep the jobsite running by fueling construction equipment using bobtail fuel trucks and stationary fueling stations. This is a fast-paced, high-responsibility role for drivers who take pride in safe, reliable work and are ready to commit to a demanding schedule.
Responsibilities
- Operate bobtail fuel trucks to fuel construction equipment across the jobsite
- Fuel equipment at stationary fueling stations as needed
- Follow all DOT, HazMat, and site safety procedures, including spill prevention and PPE use
- Track and report fuel inventory daily with accurate records
- Communicate clearly and professionally with customers and site personnel to keep equipment fueled and on schedule
- Perform and document pre- and post-trip inspections
- Report any equipment issues, safety concerns, or discrepancies right away
Requirements
- Valid Class A or Class B CDL with HazMat and Tanker endorsements (required)
- Current DOT medical card
- Clean driving record
- Safety-minded, with a strong commitment to following procedures
- Ability to work 12-hour shifts, 6 and sometimes 7 days per week
- Strong attention to detail, especially with inventory and record-keeping
- Excellent communication and customer service skills
- Reliable, self-motivated, and able to work independently or as part of a team
- Ability to pass a background check and DOT drug screen
- Fuel delivery or construction site experience preferred
What We Offer
- Housing provided
- Per diem
- Overtime pay
- Medical, dental, and vision insurance
- 401(k)
- Long-term, steady work