
Wood Commissioning is recruiting for an experienced Balance of Plant (BoP) Commissioning Engineer to support EDF at Hinkley Point C (HPC). Ideally based locally to the Bridgwater area, the successful candidate will be engaged on a 12 month rolling PAYE contract working 40 hrs/wk Monday to Friday at HPC Site Office in Bridgwater.
#LI-Onsite
The Role
The Balance of Plant Commissioning Engineer’s role will evolve during the lifecycle of the project and combine technical knowledge with project delivery skills. At the early stages you will contribute to detailed planning and preparation, including reviewing contractor-produced commissioning documentation. Following this, you will execute commissioning tests and conduct surveillance on contractor-led activities as part of a team and analyse the results to justify the readiness of the HPC units to safely enter commercial operation.
As a Commissioning Engineer you will be responsible for the delivery of test specifications and safety documentation during preparation for commissioning. You will perform site testing safely and effectively, assist with the analysis of commissioning results, resolve problems and take responsibility for ensuring that deliverables supporting HPC commissioning are provided on time, in accordance with the Project’s requirements. This will include giving support to contract partners and taking part in contractual review and acceptance activities
Our Clients and Projects
Designing the future. Transforming the world.
Hinkley Point C (HPC) is a major infrastructure project encompassing the design, construction and commissioning of two European Pressure Reactors (EPR’s) in the South-West of England.
The Project is of significant importance to the UK’s future energy requirements, being the first to be built in the UK for over 25 years and is designed to operate for 60 years. When in operation it will deliver circa 3,260MW of secure low carbon energy to the UK energy network, which is enough energy to power approximately 6 million UK homes. The Project also represents a significant investment in the UK nuclear industry and the related technical supply chains.
Hinkley Point C is a vital part of the UK’s future energy strategy. As the first of the UK’s next generation of Nuclear power stations, HPC is both of high profile and high complexity. The HPC Commissioning Team is expanding in preparation for the commissioning of Hinkley Point C, the first nuclear power station to be built in a generation.
Key responsibilities will include:
What makes you remarkable?
Expected:

Wood is a global leader in consulting and engineering, delivering critical solutions across energy and materials markets. We provide consulting, projects and operations solutions in 60 countries, employing around 35,000 people.