Ensures the accurate and timely production of the monthly General Ledger (GL). Provides assistance to the Accountants in the production of reports, work papers, and documentation necessary to ensure compliance of accounting controls, practices, and procedures.
Essential Functions
Qualifications and Education Requirements
Bachelor’s degree in Accounting or Finance required; Associates of Arts Degree and equivalent accounting training or related work experience can be substituted for degree at the rate of two (2) years per one (1) year of academics.
Core Competencies: Adaptable, Collaborative, Conscientious, Critical-Thinking, Outcome-Driven, Professional
Technical Competencies/Skills
Soft Competencies/Skills
Physical Requirements
Must be able to follow established protective measures including wearing required personal protective equipment (PPE). Must possess a valid driver’s license and acceptable Motor Vehicle Report.
Working Conditions
Some travel and work outside of normal business hours. While working in certain areas of the plant there is the potential for exposure to hazards typical of an industrial working environment.
“ Disclaimer - Management may modify this job description at any time and may require the performance of additional duties, or modification of physical requirements, with or without advance notice.”

Seminole Electric Cooperative is one of the largest generation and transmission (G&T) cooperatives in the country.
Seminole’s purpose is to provide safe, affordable, and reliable wholesale power to nine Member distribution electric cooperatives.
Seminole’s primary resources include the Seminole Generating Station (SGS) and the Seminole Combined Cycle Facility (SCCF) in Palatka, Florida, the Richard J. Midulla Generating Station (MGS) in Hardee County, Florida, and the Cooperative Solar facility, located on property adjacent to MGS. Approximately 2 million people and businesses in parts of 42 Florida counties rely on Seminole’s Member cooperatives for electricity. Seminole also owns and maintains more than 350 miles of transmission line.